My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3810 RIVERFRONT BLVD BLDG B 2025-10-27
>
Address Records
>
RIVERFRONT BLVD
>
3810
>
BLDG B
>
3810 RIVERFRONT BLVD BLDG B 2025-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 10:21:17 AM
Creation date
7/31/2025 10:20:58 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3810
Tenant Name
BLDG B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
544
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IECTIONS: Read the WAG section below to determine if plan review is required or not required. Then select the box next to (a) to <br />City Staff If plan review is not requiied and select the box next to the specific reason from WAG 296-46B-900. If plan review is <br />uired, select the box next to (b) and (c) to acknowledge that plan review is required and the electrical plans have been provided <br />i this permit application. <br />If Item (a) -(II, IIi, or v) Is selected, the work must also comply with section (a)-(vil). See arrow flow chart below. <br />(3) Electrical plan review. <br />0✓ (a) Electrical plan review is not required for: <br />❑ (1) Low voltage systems; <br />(11) Lighting specific projects that result in an electrical load reduction on each feeder involved In the project; <br />El Involved <br />Healing and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder <br />Involved in the project, provided there is not a corresponding Increase In the available fault current in any feeder. <br />(Iv) Stand-alone utility fed services that do not exceed 250 volts, 400 amperes where the project's distribution system <br />❑ does not Include: <br />(A) Emergency systems other than listed unit equipment per NEC 700.12(F); <br />(B) An essential electrical system defined In NEC 517.2; or <br />(C) A required fire pump system. <br />(v) Modifications to existing electrical installations where all of the following conditions are met: <br />(A) Service or distribution equipment Involved is rated not more than 400 amperes and does not exceed <br />250 volts or for lighting circuits not exceeding 277 volts to ground; <br />(B) Does not Involve emergency systems other than listed unit equipment per NEC 700.12(F); <br />(C) Does not Involve branch circuits or feeders of an essential electrical system as defined in NEC 517.2; <br />and <br />(D) Service or feeder load calculations are Increased by 5% or less. <br />El rating <br />Electric power production sources) such as solar photovoltaic, fuel cell, or wind electric system(s) with a total <br />rating of 9600 watts or less. <br />El to <br />For installations in (a)(li), (Ili), and (v) of this subsection to be considered, the following must be avalk <br />to the electrical Inspector before the work Is initiated: <br />(A) A clear and adequate description of the project's scope; <br />(B) A load calculation(s); <br />(C) What the load changes are, providing both before and after panel schedules as needed; and <br />(D) Provide information showing that the service and feeder(s) supplying the panel(s) where the work is <br />taking place has adequate capacity for any Increased load and has code compliant overcurrent protection <br />for that supply. <br />NOTE: Electrical plan review is not required for "Medical, dental, and chiropractic cllnic" of which is a clinic or <br />❑ physicians' office where patients are not regularly kept as bed patients for twenty-four hours or more, per section <br />(1)(e)(4). <br />O(b) Electrical plan review is required for all other new or altered electrical projects in educational, institutional, or health care <br />occupancies defined In this chapter. <br />Q (g) If a review is required, the electrical plan must be submitted for review and approval before the electrical work is begun. <br />tnute.b6m <br />Ha;filth.Rr:naraapal.tate 17414061 <br />Hgrlth or Pars'dn+Fgor¢ptfginly. <br />TRa <br />PlOnAbVidw <br />N.e ulrad <br />hospital <br />Yes <br />Noising honta unttprlgngterw <br />rat4 udlt <br />yqs <br />eanrdin home <br />Yes <br />AYsk'rl ltvin�i@[lllg <br />Yes <br />prNatealsohoilsm hospital <br />Yes <br />PMAOI psythlottia`hotbubf <br />Yes <br />Maternity home <br />Yes <br />Ari :ulat4.rY4urgeryf$ lliy <br />ties <br />Renal hemoditalysittlinIC I <br />Yes <br />rF4slUgpdni tteeh,-'AtWili <br />Us <br />Enhantedservisentllit. <br />Yes <br />Ayelt r4srdtinlriil 7Qfi4hllgatfon <br />tenter <br />Ws <br />L'dif56llpnolanif�bf4tthltloitslPealliffga plates.otAspAthVfly,.gitgSherFtigllttl6s. <br />Rtivahtft!ItRl.InstitUtloni;Or <br />Fl$l'rasvteW. <br />ovor, Fee) 11ty7ypsan <br />a'�gtilretl <br />�Edttei tionol <br />IYas: <br />Iji5afd1i.6nR1 <br />m <br />Note$ to Tallies 00111 V. and 00.6•2, <br />1. A c1ty.aVtiidY,tr05i to do. elaetrtcolln$pogf6tis <br />trey requtre plg6 e6vlaw drrfaillty tygnst at <br />taVi@wpd.bY t110 UERsitir�aiiK: <br />Page 2-Plan Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.