My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5010 DOVER ST Geotech Report 2025-07-31
>
Address Records
>
DOVER ST
>
5010
>
Geotech Report
>
5010 DOVER ST Geotech Report 2025-07-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 11:44:01 AM
Creation date
7/31/2025 11:43:42 AM
Metadata
Fields
Template:
Address Document
Street Name
DOVER ST
Street Number
5010
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TYPICAL FOOTING DRAIN <br /> Slope the surface to drain <br /> away from the wall <br /> Compacted soil general backfill,or <br /> structural fill where applicable(refer <br /> to notes below) <br /> NN,� NON ♦ .. <br /> M.AJ.rv�'•+�/.+T �A�•NNrNW+�i^+F FLOOR SLAB <br /> V..n M Jt.n✓-NWWWJ <br /> Non-woven geotextile filter <br /> fabric(Mirafi 140 NL, orequivalent),wrapped around N�NNNNNN ��� NJ CAPILLARY BREAK <br /> the drain rock <br /> Washed drain rock • FOOTING ' <br /> Minimum 4-inch diameter <br /> slotted or perforated PVC pipe <br /> (perforations facing down);lay <br /> pipe to have sufficient gradient <br /> toward dischargea <br /> NOT TO SCALE <br /> NOTES: <br /> 1.) Perforated or slotted rigid PVC pipe should be tight jointed and laid with perforations or slots down, <br /> and with positive gradient toward discharge location(s). The pipe should be placed at or slightly <br /> above the elevation of the bottom of the footing. Do not replace rigid PVC pipe with flexible <br /> corrugated plastic pipe. <br /> 2.) Do not connect other drainage lines to the footing drain lines. Drain line cleanouts should be <br /> installed at appropriate locations to allow inspection and maintenance of the lines after construction. <br /> 3.) If the backfill will support sidewalks, driveways, patios, or other structures, it should be compacted <br /> to at least 90%of its maximum dry density based on the Modified Proctor test method,except that <br /> the top 12 inches of the backfill should be compacted to at least 95%of the maximum dry density. <br /> 4.) The geotextile filter fabric should be placed around the drain rock as shown, and not wrapped <br /> directly around the pipe. <br /> TYPICAL FOOTING DRAIN <br /> GEO Group Northwest, Inc. PROPOSED ADDITION <br /> Geotechnical Engineers,Geologists,& 5010 DOVER ST <br /> Environmental Scientists EVERETT,WASHINGTON <br /> SCALE: NONE DATE: 8/22/2022 MADE: SH CHKD: WC JOB NO. G-5756 PLATE 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.