Laserfiche WebLink
Four Corners Short Plat Stormwater Site Plan <br />STORMWATER SITE PLAN <br />FOR <br />FOUR CORNERS SHORT PLAT <br />CITY OF EVERETT, WA <br />TABLE OF CONTENTS <br />SECTION 1 — PROJECT DESCRIPTION <br />FIGURE 1 —VICINITY MAP <br />SECTION 2 — SITE ASSESSMENT <br />SECTION 3 — SITE DEVELOPMENT PLAN WON -SITE STORMWATER MANAGEMENT ........................ <br />SECTION 4 — CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN <br />SECTION 5 — SOURCE CONTROL PLAN <br />SECTION 6 — SPECIAL REPORTS AND STUDIES <br />SECTION 7 — OTHER PERMITS <br />------------------------- <br />SECTION 8 — PERMANENT STORMWATER CONTROL PLAN <br />-------------- <br />SECTION 8.A — OFF -SITE ANALYSIS <br />SECTION 8.B — PRE -DEVELOPED HYDROLOGY <br />SECTION 8.0 — DEVELOPED HYDROLOGY <br />SECTION 8.D — STORMWATER FLOW CONTROL PLAN <br />SECTION 8.E — CONVEYANCE ANALYSIS <br />SECTION 8.F — MAINTENANCE AND OPERATION PLAN <br />FIGURES__._.._.. <br />FIGURE 2 — EXISTING SITE CONDITIONS <br />FIGURE 3 — ON -SITE DEVELOPED SITE CONDITIONS WITH DRAINAGE BASINS <br />APPENDICES <br />APPENDIX A — NRCS SOILS REPORT, GEOTECHNICAL REPORT, AND CRITICAL AREAS REPORT <br />APPENDIX B — 2019 SWMM EXCERPTS AND COE MAPS <br />APPENDIX C — SOURCE CONTROL PLAN (BMP'S) <br />APPENDIX D — PREVIOUSLY PREPARED REPORTS <br />3 <br />CPH Project No. 0024-18-042 October 23, 2Q20 <br />CPIH CONSULTANTS Page 1 <br />