Four Corners Short Plat <br />Stormwater Site Plan <br />Silt fences will be placed as shown on the plans or as directed by the City inspector. <br />In addition, sediment will be removed from paved areas in construction work areas manually or using <br />mechanical sweepers, as needed, to minimize tracking of sediments on vehicle tires away from the site <br />and to minimize wash off sediments from adjacent streets in runoff. <br />Whenever possible, sediment laden water shall be discharged into on -site, relatively level, vegetated <br />areas. In some cases, sediment discharge in concentrated runoff can be controlled using permanent <br />stormwater BMPs (e.g., infiltration swales, ponds, trenches). Sediment loads can limit the effectiveness <br />of some permanent stormwater BMPs, such as those used for infiltration or biofiltration; however, <br />those BMPs designed to remove solids by settling (wet vaults or detention tanks) can be used during <br />the construction phase. <br />5. Stabilize Soils <br />Exposed and unworked soils shall be stabilized with the application of effective BMPs to prevent <br />erosion throughout the life of the project. The specific BMPs for soil stabilization that shall be used on <br />this project include: <br />• BMP C121: Mulching <br />• BMP C125: Topsoiling <br />• BMP C140: Dust Control <br />In general, cut and fill slopes will be stabilized as soon as possible and soil stockpiles will be <br />temporarily covered with plastic sheeting. All stockpiled soils shall be stabilized from erosion, <br />protected with sediment trapping measures, and where possible, be located away from storm drain <br />inlets, waterways, and drainage channels. <br />6. Protect Slopes <br />All cut and fill slopes will be designed, constructed, and protected in a manner than minimizes erosion. <br />The following specific BMPs will be used to protect slopes for this project: <br />• BMP C120: Temporary and Permanent Seeding <br />• BMP C207: Check Dams <br />Minimal construction is proposed for wet weather season and slope protection can be established with <br />final landscaping. <br />7. Protect Drain Inlets <br />All storm drain inlets and culverts made operable during construction shall be protected to prevent <br />unfiltered or untreated water from entering the drainage conveyance system. Storm Drain Inlet <br />Protection (BMP C220) will be implemented for all drainage inlets and culverts that could potentially <br />be impacted by sediment -laden runoff on and near the project site. The following inlet protection <br />measures will be applied on this project: <br />• BMP C220: Storm Drain Inlet Protection <br />8. Stabilize Channels and Outlets <br />Where site runoff is to be conveyed in channels, or discharged to a stream or some other natural <br />drainage point, efforts will be taken to prevent downstream erosion. The specific BMPs for channel <br />and outlet stabilization that shall be used on this project include: <br />• BMP C209: Outlet Protection <br />All temporary on -site conveyance channels shall be designed, constructed, and stabilized to prevent <br />erosion from the expected peak 10 minute velocity of flow from a Type 1 A, 10-year, 24-hour <br />CPH Project No. 0024-18-042 <br />CPIH CONSULTANTS <br />October 23, 2020 <br />Page 7 <br />