Laserfiche WebLink
City of Everett Permit Review <br /> EVERETT Status:Reviewed for Permit <br /> GENERAL NOTES 11/02/2023 3:00:02 PM <br /> 1. 16.8K ESFR SPRINKLERS SHALL BE INSTALLED PER NFPA 13 SECTION 8.12. 16.8K <br /> ESFR SPRINKLERS SHALL BE INSTALLED SO THE DEFLECTORS ARE NOT MORE THAN 14" <br /> HIGHEST BRANCH LINE " N N AND NOT LESS THAN 6" BELOW THE CEILING PER NFPA 13 SECTION 8.12.4.1.2 <br /> ON SYSTEM� <br /> ESFR SPRINKLER 2. BRANCH LINES ARE TO BE INSTALLED PER SECTION 9.3.5.5.10. LATERAL SWAY BRACING <br /> AGE 793oECA ASC FIG AF72D STRUCTURAL ATTACHMENT IS NOT REQUIRED WHEN BRANCH LINES ARE SUPPORTED BY HANGER RODS LESS THAN <br /> ECCENTRIC DRAIN CAP AUTOMATIC AIR VENT HEAD —ABC FIG AF720 STRUCTURAL ATTACHMENT �W/ASC FIG.AF700 SWIVEL ATTACHMENT 6" LONG MEASURED BETWEEN THE TOP OF THE PIPE AND THE POINT OF ATTACHMENT <br /> W/T'POL W/END CAP BRANGHLINE W/ASC FIG.AF700 SWIVEL ATTACHMENT SWAY BRACE ATTACHMENT <br /> SWAY BRACE ATTACHMENT TO THE BUILDING STRUCTURE. <br /> EQ T Q 'IftOIS GIRDER BAR JOIST 3. 36 INCHES MUST BE MAINTAINED BETWEEN ESFR SPRINKLER DEFLECTORS AND TOP OF HANGER LEGEND <br /> STORAGE PER SECTION 8.12.6 <br /> AUTOMATIC AIR VENT - 4. HVLS (HIGH VELOCITY LOW SPEED) FANS SHALL BE CENTERED BETWEEN 4 ESFR A "U" HOOK <br /> UNIT HEATER MINIMUM ANGLE FROM - SPRINKLERS AND LOCATED SO THAT THE TOP OF THE FAN BLADES ARE LOCATED A B COACH SCREW ROD <br /> NO SCALE VERTICAL PLANE scH ao PIPE MINIMUM OF 36" BELOW THE SPRINKLER DEFLECTORS. HVLS FANS SHALL BE WIRED TO <br /> . D BM. CLAMP W "STRAP <br /> BRANGHLINE A - SHUT DOWN UPON ACTIVATION OF SPRINKLER SYSTEM WATER FLOW SWITCHES. E EYELET <br /> USE 92 <br /> SON.40 PIPE--" BAR JOIST F FLUSH SHELL <br /> To ANVIL FIG. <br /> TOP BEAR,CLAMP G CEILING FLANGE <br /> W/10"RETAINER STRAP H SIDE BEAM BRACKET <br /> FOR 4"PIPE ESFR SPRINKLER SEISMIC BRACING LEGEND K SHORT CLIP <br /> HEAD M ALL THREAD ROD <br /> 'C'SPAN USE Vz"ANVIL FIG.92 ABC FIG AF035 J AS C FIG AF730 <br /> TOP BEAR,CLAMP swnY BRACE ATTACHMENT swnY BRACE ArrACHMENTf � SIZE OF PIPE BRACE PIPE BRACE PIPE ATTACHMENT STRUCTURAL MINIMUM MAXIMUM N TOGGLE NUT <br /> .A. (LATERAL E0 BRACE) (LONGITUDINAL EO BRACE) <br /> W/10'RETAINER STRAP SPRINKLER MAIN P POWDER DRIVEN STUD <br /> FOR 6"&a"PIPE BRACE N0. TO BE BRACED SIZE & LENGTH MAX LENGTH TO PIPE ATTACHMENT BRACE ANGLE SPACING R EXPANSION BOLT <br /> �( UNIT HEATER PLACEMENT ASC FIG AF72o STRUCTURAL ATTACHMENT SB-1 8" SCH10 11A" SCH40 9'-0" AF035 AF720 60° 40'-0" S PIPE SPIKE <br /> 11 ATR 51/z"ATR .. NO SCALE �W/ASC FIG.AF700 SWIVEL ATTACHMENT ASC FIG AF720 STRUCTURAL ATTACHMENT SB-2 8 SCH10 1 1/4 SCH40 9—0 AF730 AF720 60° 42—0 T <br /> 'D'PIPE SIZE J'- SWAY BRACE ATTACHMENT W/ASC FIG.AF700 SWIVEL ATTACHMENT <br /> SWAY BRACE ATTACHMENT SB-3 8" SCH10 11A" SCH40 9'-0" AF035 AF720 60° 40'-0" v <br /> BALL THREAD Roo(E) USE 111'BE ANVIL Plc.92 BAR JOIST SB-4 6" SCH10 1" SCH40 10'-6" AF035 AF720 60' 40'-0" W <br /> NUT&WASHER_, (SR LENGTH) TRAPEZE RING DS FIG 69H TOP BEAM CLAMP 7 <br /> FKH <br /> SIZE PER'D' W/10'RETAINER STRAP JOIST GIRDER SB-5 6 SCH10 1 V4 SCH40 9—0 AF035 AF720 60° 10—0FOR 6"&9"PIPE Y <br /> ALL THREAD ROD MINIMUM ANGLE FROM oSB-6 4" SCH10 1 Va" SCH40 9'-0" AF035 AF720 60° 20'-0 z <br /> (LENGTH PER PLAN) STEEL DECK 3/e'ANVIL FIG.92 - SCH.40 PIPE VERTICAL PLANE s1 SB-7 8 S(.'H10 11/4 SCH40 9-0 AF730 AF720 60° 45—0 APPROVAL REQUIRED <br /> TOP BEAM CLAMP r HANGER RING SIZE PER PLAN SPRINKLER PIPE W/a RETAINER STRAP SB-8 6 SCH10 11A SCH40 9—0 AF730 AF720 60° 80—O CITY OF EVERETT <br /> FOR PIPE 4"&SMALLER BAR JOIST 40 PIPE <br /> HGR. 'B' 'D' 'E' 'F' 'F' SB-9 4" SCH10 1" SCH40 10'-6" AF730 AF720 60' 80'-0" <br /> LABEL 'A' PIPE 'C' PIPE SIZE HOLE HOLE HOLE STEEL BAR JOIST 3/a°ALL THREAD ROD <br /> NO. HOLE DIM. LENGTH SPAN &SCHEDULE SIZE DIM. SIZE FOR PIPE 4"&SMALLER SB-10 4 SCH10 1 SCH40 10'—6 AF035 AF720 60° 10—0 <br /> FOR <br /> ALL THREAD ROD SPRINKLER MAIN11 <br /> T 1'-3' 7'-6" 7'-U' 21h°0 SON.10 911C 61/2" 9/16' FDR s&a"PIPE �� SB-11 4" SCH10 1" SCH40 10'-6" AF730 AF720 60' 80'-0° <br /> ANVIL FIG.69 (SEE PLAN FOR LENGTH) f ASC FIG AF730 1 TDIP RnnxG(F) „ <br /> RING HANGER ASC FIG AF035 SWAY BRACE ATTACHMENT SB-12 6 SCH10 1 /4 SCH40 9—0 AF035 AF720 60° 10—0 =� m <br /> T2 1'-3" T-6' 7'-0' 2"0 SON.10 711C 61/2- 7116" SWAY BRACE ATTACHMENT 0 <br /> (SIZE PER PAN) (LONGITUDINAL ED BRACE) SB-13 4" SCH10 11A" SCH40 9'-0" AF035 AF720 60° 10'-0" � z�. .1 <br /> 29 <br /> (LATERAL EO BRACE) <br /> SB-14 6" SCH10 11A" SCH40 9'-0" AF035 AF720 60° 20'-0" � 2GO ®I/2 <br /> SB-15 4" SCH10 1" SCH40 10'-6" AF035 AF720 50° 40'-0" , <br /> HANGER TYPE'T' HANGER TYPE'D' LATERAL EQ BRACE LONGITUDINAL EQ BRACE SB-16 8" SCH10 1" SCH40 3'-6" AF035 5i8x33/4 KBT22 60' 25'-0" QM ECK, "" m"2 <br /> NO SCALF NO SCALE NO SCALE NO SCALE SB-17 8" SCH10 1" SCH40 3'-6" AF730 5/ax33/4 KBTz2 60° 25'-0" FITTING LEGEND <br /> P PIPE-O-LET <br /> SH GROOVED SHAPED NIPPLE <br /> TOM THREADED SHAPED NIPPLE <br /> ADM ADJUSTABLE DROP NIPPLE <br /> FUG FLANGE <br /> III RC REDUCING COUPLING <br /> (1 EFECTUR[ TO CENTER <br /> /`� UNF OF PIPE IN INCHES <br /> r �m g 1 2-WAY EARTXWAI(E BRACE <br /> 0 6� 10-0 10qG <br /> ��6�6 9-0 9'0 Ip 6 I-0 �6 10 9 6 FIG9 9-0 5�6 5 6 21 26 '-0 9 6 10 11-0 R 21 6 9-0 10 6 �A 0 12. 4 6 5'fi II-0 1 WE 211 211 00- 11-0 _ 4 6 5'6 RBI <br /> 21 W 1 � 1°/22/23 M n 1 � d-WAY EARTHOUNNE BRACE <br /> 0- se 1 Z 1 <br /> 1 � � j,Mw� j SPRINKLER LEGEND <br /> (7� ' REMOTE AREA 1SIG (7� tt <br /> (1SPRINKLER <br /> 2) K17 ESFR SPRINKLER HEADS `T' I�;i 1 =� ORIFICE SIZES <br /> �ro10 DRAULICALLY CALCULATED TO ® liioa - 1 �= AxO TYPE a21h 21BIG, 21h 21h Vz 21h Ih Ih 21 21h 24k 21h 21h 2 1h 2N 2 21h 21h Va N 24k 1h 2V4 1h 2N 2N 21h 21h 4R 2N yU IHI`p0-6 10-0 1III <br /> 0 6-69-0 10-6 I-0 6 1C9-6 9- 9-0 5-6 5 6 -0 9-6 t0 t 0 S-6 -6 9-C t0-6 0 OVIDE A 52 PSI MIN. E.H.P. 8-6 9-0 tt-0 a-6 5-6 J-6 8-0 C-I _ N y21n z1n z1n 21n FLOW AT NODE(BR1): 1,457.8 GPM® 104.1 PSI 2s5 c.l o „ c1 i s 3 i 1 O 1/2sll0-fi 1-6 C-6 ' 0-6 0-6 SB-10 I=u-B: 2 168 Ifi I 6PMY QHASS FILE:IPT-SUMNER-SY51 Iz w °�U ` 2OR Eo e 1Ie0 - i ❑ ❑�374 <br /> 2�h 21h 2 2 m21h 21h 44 244 Vi Vi 21 24rz 21h 21h 21h 2 4rz 244 21 2I O2N 1h 0 N 0 21h O i 244 24rz 21h 244 2N N m 24z 21h 2N BIT 1@ 21hOp'1h 24rz RV. f~/1 1 04 oy zl 32 SPRAY O ■ " <br /> 0-6� 10-0 10 3- fi-6 9-0 9-0 10-6 I-0 -6 10 9-6 9- 9-0 IS 5 6 -0 9-B to 11-0 3-6 -6 9-0 10-fi 0 10-0 4-6 5-6 II-0 S-6 9-0 11-C 4-fi 5-6 J-6 8-0 0-I 1 y n 6 All <br /> 1 3 ) 1 a Q,/2• <br /> B a s -O oe - s 1 p a a `�ul z e 16 z SO— <br /> z�n 21 z �zln zIn z1n o 1n 1n z z1n z�n zIn z n zw z z� z1n W w zw 1n z1n xv: x1h z1n 1n o zw 7 21n z1n�» `-------_J <br /> 1• 2 DRY TYPE 1' <br /> 2a HE <br /> 10-D to }- s-s 9-D 9- 10-6 I-0 -6 10 9-6 9-0 5-6 s 6 -0 9-6 to n-Q 3-6 -6 9-o to-s -o -0 4-s s-6 a-o B-s 9-o a-o - s-s ]-6 e-WQ a 1I SPRINKLER HEAD LEGEND ®• ' <br /> Sti C-E 241 244 S� WENLEADCH <br /> HEAD K HfAO FNKHM <br /> 0-6 0-6 p-6 5111 WWUF. YODEL SIH TYPE wyEXCH SIZE FACTOR FINISH FlNISHREMP Ott <br /> b b 17 RFLABIL JLI7 RM914 ESFR JI 3/4• 16.8K BONZE N/A 16T 372 <br /> n f 24 <br /> 211 21h 2 2 21h GO- <br /> 21h 1h 2Vz Ih Ih 21 21h 2N 21h 21h 2 N 244 2 21h 24x 44 1h 2N MI 2% 21h 2% 21h 2N 2N 2% 2Vx 1h� 21h 2v <br /> 5--6 10-0 10 3- fi-6 9-0 9-0 10-6 I-O -6 10 9-6 9- 9-0 5-6 5 fi -0 9-fi to it-0 3-fi -fi 9-0 10-6 -0 10-0 4-fi 5-fi II-0 —Al8- 9-0 11-0 4-fi 5-6 )-fi 8-0 D-1 <br /> Q Bx6 CR " � 6�10 a <br /> T_ G _ SYSTEM #1 _ <br /> 21n Oa TY <br /> j( 21n DID 2 2 21h 21h N 2N N Vi 21 21h x4z 21h 21n 21 N x1h R 21h 21n Vz H RVz N 2N 21 <br /> 24] 2N 2N N xN 21h 2N 21n Vz 21h 21 <br /> C-6 10-o 10 3- fi-6 9-0 9-0 10-6 I-0 -6 10 9-6 9- 9-0 5-6 5 6 -0 9-6 10 11-0 3-6 -6 9-0 10-6 -0 10-0 4-6 5-1 II-0 B-6 9-0 11-0 4-6 5-6 J-6 8-0 0-I <br /> LW/ <br /> 0-6 TYPICAL HANGER TO BE <br /> B '6D'U.N.O. <br /> o i n Oao TOTAL 372 <br /> 2% 21 2 21n 21n Vz Vh Ih Ih 2 2N 2N 21n 21n 2 N 2N 2 2N 21n W N 2% 1h 2N 2N 2% 1 21h 1h 21 21 2% 21n N 2N Z QUALITY CONTROL BY DATE <br /> 0-61 t0-0 10 3- 6-6 9-0 9-0 10-6 I-0 6 10 9-6 9- 9-0 -0 9-6 t0 tt-0 3-6 -6 9-0 10-6 -0 10-C 4-6 5-6 II-0 8-6 9-0 tl-C a-6 5-6 J-6 8-0 0-I <br /> 7'-p" 2 Sti 2N. 2N. RVz 21h 2N S�Io TY APPROVED FOR FABRICATION BY DATE <br /> 1-6 0-6 o-6 0-6 <br /> 7 7 GENERAL NOTES <br /> D O MATERIAL AXD EWIPMENT TO BF NEW AND UL 11311 OR FM APPROVED. <br /> 2�h 21h 2 2 " 21h 21h 41 2Vz Ih Ih 21 24rz 2N 21h 21h 2 y 244 2 24rz 2y N y 2N Vz 244 24rz 2N 21h 2Vz N 244 244 2Vz 21h Nn 24rz RV. ALL <br /> 0-6 10-0 10 3-1I fi-6 9-0 9-0 10-6 I-0 -6 10 9-fi 9- 9-0 5-6 5 6 -0 9-B 10 11-0 3-6 -fi 9-0 10-D -0 10-C 4-fi 5-fi 11-0 B-6 9-04-6 5-6 7-6 8-0 0-I <br /> aI • • S •1�_D' 2. SHOWN ENSI HIS ARE CENTER <br /> TO CENTER ARE ENO IOXCEPT RISERS A DIMENSNNS <br /> T 0 3. fARTHOUAKE BRACING SHALL BE PROVIDED IN ACCORDANCE WITH <br /> R NFPA PAMPHLET NO.13,2016 LOTION. <br /> - 21n 2.2 d. PIPE HANGERS AND METHOD OF HANGING 10 R IN ACCORDANCE WITH <br /> O NEPH PAIEAS A 2OF H NGING. <br /> 1� 24i 21 ~2 21n xIh N 21h 1h 1h 2 245 x1n 21n 21n 2 N 2% x 2% z�n Vz N RN 1h 2N 245 xVd xN 21h 1h 2N 2% 21h 244 Vz 245 <br /> 0-8 1C-0 10 3- 6-6 9-0 9-0 10-6 I-0 6 10 9-6 9- 9-0 5-6 s 6 -G 9-6 247 10 11-0 3-6 -6 9-0 10-6 244 -0 to-0 4-6 1-6 II-0 8-6 2N 9-0 11-0 4-6 5-6 7-6 6-G 0-I PIPING SHALL BE IN ACCORDANCE WIN NFPA PAMPHLET NO.13,2016 EDITION <br /> "I i u - 0-6 s—lo 6. "HAD <br /> H D11 1111 AND <br /> L[TE oI THREADED L o.ED,IN-R IN ACCORDANCE <br /> RyIIl4. b b 3,2016 m <br /> '�1-0" 7 TE J. OWNER To PROVIDE ADEQUATE HEAT IN AREAS PROTECTED BY A WET PIPE SPRINKLER <br /> O SYSTEM To PREVENT WATER IN PIPES ROM FREEZING. <br /> ILO . LL WIRING Of ELECTRICAL DEVICES(IF REQUIRED)TO BE HiOVID[D <br /> 24x 2Vx 2 2 21h 21h 21h Ih Ih 21 21h 21h 21h 2 4h 2N 2 24h 2Vx 44 1h 244 MI 21h 21h 2Vx 21h 21h % 2% 2 2Vz 2Vx 1h� 21h 2Y. ABY OTHERS. <br /> D-6 10-0 10 3- fi-6 9-0 9- 10-6 I-0 6 10 9-6 9-0 5-6 5 6 -0 9-fi to 11-0 3-6 -fi 9-0 to-fi -0 4-6 5-fi II-0 8-6 9-O II-0 <br /> \2a 9. PANTING OF PIPE h EQUIPMENT(IF REQUIRED)TO BE PROVIDED <br /> Sti 0-6 1-6 0-6 o-6 O-6 S~ Bl OIHERG. <br /> o T 12 10.FURRING OF PIPE t EQUIPMENT(IF REQUIRED)TO BE PRVIDED <br /> a 31 0 _ . h BY OTHERS. <br /> 2'4 21n 2 m 2 �21h 21h N 2N Ih Vi 21 2y RVz 21h 21h 2 N 21h 2 2N 21h Vz H 2. N 21h 21h 21h 24] 2N N o 21h 21h 2N 211O Vz 21h �1 <br /> 0-6 10-0 10 3- 1-6 9-0 9-0 10-6 I-0 -6 10 9-6 9- -0 9-6 10 11-0 }-6 -6 9-0 10-fi -0 10-0 4-6 5-fi II-0 B-6 9-0 11-0 4-fi 5-6 J-6 B-0 0-I DESIGN CRITERIA <br /> 19-4 1/7�1 /J7�) <br /> 216 8 W5 O Y 8 8 8 8 8 8 8 B 8 B Y S� 8 <br /> 0 10 21-0 21 0 x1-0 21-G 21-0 _ 21-0 21-0 21-0 21-0 21-0 21-0 21 0 _ 1-0 12 21-0 2 <br /> - SEE NOTES SHEET FP <br /> 21h 2�2 21n V d 2 21n 21n Vz 21h C - Ih Ih 21n 21 2N 24z 21n 21n 2 N 2N 2 24 21n N S Nffl 2N 1n 21n 21h 21h2 21h 211 1h 2N SB 2N 21h 21h Va 2y 1_p <br /> 0-61 10-0 10 3- 6-6 9-0 9-0 10-6 I-0 -6 5-6 10 9-6 2 9- 9-0 5-6 5 6 -0 9-6 10 11-0 }-6 -6 9-0 10-6 -0 10-0 4-6 5-6 II-0 B-6 9-0 11-0 4-6 5-6 ]-6 B-0 <br /> 1C 0-6 2y 2Vz 244 2N OJ <br /> -0 0-fi I-6 0-fi o-6 0-6 �I . <br /> A <br /> PIPE NOTES <br /> 1. WELDED/GROOVED MAIN PIPING TO BE SCH10 BLACK <br /> 2. WELDED/GROOVED BRANCHLINES TO BE EDDY FLOW <br /> 3. THREADED PIPING TO BE SCH40 BLACK <br /> 28'-0" 56'-0" 56'-0" 56'-0" 56'-0" 56'-0" <br /> REVISIONS <br /> 1 2 3 4 5 6 ND DATE BY DESCRIPTION <br /> C� SYSTEM#1 2 0 <br /> 0' <br /> NOTE: THIS IS AN EARLY SUPPRESSION FAST RESPONSE SPRINKLER SYSTEM. BRANGHLINE & SPRINKLER SCALE:3/32"=1'-0" <br /> HEAD LOCATIONS ARE CRITICAL. E.S.F.R. SYSTEMS REQUIRE SPECIAL CONSIDERATION REGARDING 0' 5' 20' <br /> PLACEMENT OF LIGHTING, DUCT WORK, PROCESS PIPING, ELECTRICAL CONDUIT RUNS, ETC. SCALE 3/32"=1'-0" J <br /> SPRINKLER PIPING CAN NOT BE ROUTED AROUND OBSTRUCTIONS DUE TO INCREASED FRICTION LOSSES, oNmAa w x: <br /> OR LOWERED FROM ROOF STRUCTURE DUE TO CODE REQUIREMENTS. IT IS UNDERSTOOD THAT FOUSHEE & ASSOCIATES COMPANY, INC. <br /> REQUIRED COORDINATION WITH THE ROOF STRUCTURE, JOIST PANEL POINTS, JOIST BRACING, DUCT WORK, ESFR OBSTRUCTION CRITERIA � 3240 - lEE AVE SE <br /> LIGHTING, ELECTRICAL CONDUIT, AND OTHER PIPING WILL BE ACCOMPLISHED TO PROVIDE THE ` <br /> CLEARANCE REQUIRED FOR FOR AN E.S.F.R. SYSTEM. 1 BELLEVUE, WA 98005 <br /> MATTHEW CHILES: 425-746-1000 <br /> NOTE: <br /> IF THE OBSTRUCTION IS 24"OR GREATER BELOW NOTE: NOTE: NOTE: <br /> THE SPRINKLER DEFLECTOR,DISREGARD IT IF THE THE SPRINKLER MUST BE AT LEAST 12' THE SPRINKLER MUST BE AT LEAST 12" THE SPRINKLER MUST BE AT LEAST 24• NOTE: PROJECT NAPE: <br /> DEFLECTOR,THE THANKLER M24"UST HE <br /> THE SPRINKLER ROOF DECK pOST 12" FRiHENO LLY FROM BSTRUCTIONTME EDGE ROOF DECK O�RTH�NTALLYOBSTRUCPONFROM THE EDGE ROOF DECK O�RTH�NTALLY FROM BSN2UCPONTHE EDGE THE SPRINKLER MUST BE AT LEAST 12" ROOF DECK <br /> ROOF DECK HORIZONTALLY FROM THE EDGE OF THE OBSTRUCTION. ROOF DECK HORIZONTALLY EDGE <br /> SEAWAY COMMERCIAL CENTER <br /> SYSTEM #5 m <br /> SYSTEM #2 7007 SEAWAY BLVD <br /> CONNNuous NOR. CONTINUOUS HOR o it 41NDE <br /> EVERETT, WA 98203 <br /> CONTINUOUS NOR OR'X'STEEL JOTS FOR X'SEEL JOIST I. SYSTEM #4 <br /> OR X'STEEL JOIST BRIDGING BRIDGIN g�BRIKING SYSTEM #1 SYSTEM #3 PATRIFPo99CF <br /> 0 3/d"TO 11/a'WIDE 12 12 UP TO Na'WIDE__ 12" iT' WWW.PATRIOTFIRE.COM <br /> I 1 4 TO Y WIDE 12" CONDUIT OR PIPING OR OR CONDUIT OR PIPING OR OR 2°THRU 12'WIDE / 12' 12'/ OR PARALLEL TO SPRINKLERS GREATER GREATER DUCT,CABLE TRAY,ETCJ� +� ATRIOT <br /> CONDUITOR PIPING PARALLEL TO SPRINKLERS GREATER GREATER GREATER THAN I2' GREATERTHAN OR OR 2 THRU 1Y WIDE pietrod®p°lriotfire.comPARALLEL TO SPRINKLERS GREATER GREATER S LOCATED THRU 24'WIDE OR 12"THRU 24" 2'THRU 17 , 12• 12 �2°THRU IT WIDE GREATER GREATER PIPING <br /> FOR ALL OBSTRUCTIONS LOCATED L�SSATHANBC BELOWSTRUllO SPRINKLER DUCT,CABLE GREATER GREATER PIPE OR PIPE DUCT,CABLE TRAY,ETC. EA EA PIPING <br /> FOR ALL OBSTRUCTIONS LOCATED LESS THAN 16"BELOW SPRINKLER GREATER GREATER FIRE PROTECTION,INC. <br /> LESS THAN 24'BELOW SPRINKLER TRAY,ETO RACK KEY PLAN 2707 71IT11 AVENUE EAST TEL (253) 926-2290 <br /> CONTINUOUS OBSTRUCTIONS CONTINUOUS OBSTRUCTIONS CONTINUOUS OBSTRUCTIONS CONTINUOUS OBSTRUCTIONS CONTINUOUS OBSTRUCTIONS TACOMA, WA 98424 FAX: (253) 922-6150 <br /> 1114"TO 2"WIDE 314"TO 1114"WIDE 0"TO3/4"WIDE GREATER THAN 12"TO 24"WIDE 2"TO 12'WIDE NO SCALE 11....�� <br /> NO SCALE NO SCALE NO SCALE GREATER <br /> SCALEND SCALE I 1 I DESIGNER PIETRO DEMONTE SHEET <br /> 1 ' ' DATE 10-22-20233 OF , F P 3 <br /> a_ JOB NO. 11-2410 <br />