Laserfiche WebLink
Final Calculations : Hazen-Williams <br /> A-PEX Design Services Inc. Page 6 <br /> CHELSEA HEIGHTS LOT 47 PLAN LENNON GL-Two Head Calculation (H.3 & HA) Date 7/22/2024 <br /> Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt <br /> to or Ftngs Pe "' Notes ****** <br /> Node2 Elev2 Fact Qt Act Eqiv Len Total Pf/Ft Pf <br /> H.2 108 0.0 1 Utr 2.0 9.000 150 18.677 <br /> to 2.000 0.0 <br /> H.8 108 4.97 0.862 11.000 0.0171 0.188 Vel = 2.73 <br /> H.8 108 0.0 1 Utb 17.0 7.000 150 18.865 <br /> to 14.000 0.0 <br /> T.25 108 4.97 0.862 21.000 0.0170 0.358 Vel = 2.73 <br /> 0.0 <br /> T.25 4.97 19.223 K Factor= 1.13 <br /> T.20 108 1.08 1 Utb 17.0 1.000 150 18.031 <br /> to 14.000 0.0 <br /> H.9 108 1.08 0.862 15.000 0.0010 0.015 Vel = 0.59 <br /> H.9 108 0.0 1 Utb 17.0 1.000 150 18.046 <br /> to Utr 2.0 16.000 0.0 <br /> T.21 108 1.08 0.862 17.000 0.0011 0.018 Vel = 0.59 <br /> 0.0 <br /> T.21 1.08 18.064 K Factor= 0.25 <br /> Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 <br />