Laserfiche WebLink
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />5/4/2023 <br />5/4/2023 <br />PLUMB 03i-ROUGH <br />JEFF M RHODE <br />PARTIAL <br />see notes <br />OVAL <br />Notes: <br />5/2/2023 12:50 PM PUGET SOUND MECHANICAL (Const) <br />Contact Name: PUGET SOUND MECHANICAL (Const) <br />Site Address: 8102 EVERGREEN WAY BLDG D <br />Phone:2535378900 <br />e-Mail: matt@pugetsoundmechanicaI.com <br />-not tested 425 master, 419 main, 418 main-lvl 6 water and tubs ok-Ivl 5 water and tubs ok-Ivl 4 water ok all tubs ok excluding fore mentioned <br />(425,419,418) <br />5/10/2023 <br />5/10/2023 <br />GAS 01-ROUGH IN <br />JEFF M RHODE <br />NOT READY <br />see notes <br />Notes: <br />5/9/2023 9:59 AM PUGET SOUND MECHANICAL (Const) <br />Contact Name: PUGET SOUND MECHANICAL (Const) <br />Site Address: 8102 EVERGREEN WAY BLDG D <br />Phone:2535378900 <br />e-Mail: matt@pugetsoundmechanicaI.com <br />-not ready reschedule for tomorrow 5/10/2023 <br />5/10/2023 <br />5/10/2023 <br />PLUMB 031 ROUGH <br />JEFF M RHODE <br />PARTIAL <br />see notes <br />OVAL <br />Notes: <br />5/9/2023 9:58 AM PUGET SOUND MECHANICAL (Const) <br />Contact Name: PUGET SOUND MECHANICAL (Const) <br />Site Address: 8102 EVERGREEN WAY BLDG D <br />Phone:2535378900 <br />e-Mail: matt@pugetsoundmechanicaI.com <br />-Ivl 3 rm 325 tub cracked <br />-Ivl 2 rm 225 shower not installed at time of inspection <br />-plumbing rough in Ivl 3 ok (excluding tub in rm 325) <br />-plumbing rough in Ivl 2 ok (excluding shower in rm 225) <br />5/11/2023 <br />5/11/2023 <br />GAS 01-ROUGH IN <br />JEFF M RHODE <br />PARTIAL <br />see notes gas rough in <br />APPROVAL <br />Notes: <br />5/10/2023 12:51 PM PUGET SOUND MECHANICAL (Const) <br />Contact Name: PUGET SOUND MECHANICAL (Const) <br />Site Address: 8102 EVERGREEN WAY BLDG D <br />Phone:2535378900 <br />e-Mail: matt@pugetsoundmechanicaI.com <br />-gas rough in building d ok <br />5/11/2023 <br />5/11/2023 <br />PLUMB 031 ROUGH <br />JEFF M RHODE <br />APPROVAL <br />Notes: <br />-all plumbing rough in and gas rough in for building d ok <br />I <br />Printed: Monday, 28 April, 2025 2 of 4 rk <br />SUPERION <br />