Laserfiche WebLink
JOHNSON BRAU N D iNc. <br />April 28, 2021 <br />James Bronder <br />Associate Engineer <br />City of Everett — Permit Services <br />3200 Cedar Street <br />Everett, WA 98201 <br />RE: FOUR CORNERS APARTMENTS — BUILDING E <br />COMMERCIAL BUILDING PERMIT - REVIEW LETTER #1 <br />PERMIT # B2010-052 <br />Mr. Bronder, <br />We are submitting the following response to your Building Permit Review Letter dated February <br />26, 2021, together with two complete sets of revised drawings for your review and approval. The <br />responses below are grouped and numbered per your original letter, which is attached for reference. <br />Architectural <br />1. A multi -family residential unit is being constructed and is subject to the requirements of <br />RCW 64.55. Please complete the RCW 64.55 Building Envelope Submittal worksheet. <br />a. Response: See attached completed worksheet for Building A. <br />2. Building height calculations in reference to Grade Plane per IBC 503.4 have been revised <br />to show compliance with 70' limit for Type V-A, R occupancy construction. See updated <br />CSOIE and exterior elevation sheets. <br />3. On Sheet A020, total on -site parking stalls provided (684 stalls) in an R-2 occupancy are <br />greater than (20). Per IBC 427.2, 5% of the parking spaces are required to have electrical <br />vehicle charging infrastructure. Please clarify and revise drawings as required as this <br />infrastructure appears to be missing. IBC 427. <br />a. Response: Locations for surface parking and garage EV charging infrastructure <br />has been identified on A020 and on the garage level plan. <br />Structural <br />4. See attached response letter from DCG. <br />5. See attached response letter from DCG. <br />6. See attached response letter from DCG. <br />7. See attached response letter from DCG. <br />8. See attached response letter from DCG. <br />15200 52nd Avenue South, Suite 300, Seattle, Washington 98188 <br />Phone 206.766.8300 <br />www.johnsonbraund.com <br />