Laserfiche WebLink
e. Expected operating state and confirmation of proper operation indicated at the smoke <br />control panel within 60 seconds. <br />9. Smoke control power and control wiring is fully enclosed in continuous raceways in accordance <br />with IBC Section 909.12.2. The equipment, control wiring, power wiring, and ductwork is <br />protected to a 2-hour fire -resistance rating as prescribed in IBC Section 909.20.6.1. <br />10. The smoke control system operated correctly under normal and secondary power. The <br />pressurization system continued to operate correctly under transfer to secondary power (tap - <br />ahead). <br />11. A weekly self -test was successfully performed. A fire alarm event during the weekly self -test <br />resulted in over -ride of the weekly self -test and automatic operation of the smoke control system <br />and initiation of the fire alarm notification devices. Testing also demonstrated that the weekly <br />self -test did not over -ride automatically or manually initiated smoke control events. <br />12. The printer for the fire alarm system has been installed in the Building B fire alarm room. <br />FINAL COMMENTS: <br />The Stair 1 fire alarm wiring serving the smoke control fan and damper was originally planned to run from <br />the fire alarm room to Stair 1 in the PT deck. However, the conduits were damaged and unusable. <br />Therefore, Stair 1 smoke control fire alarm wiring has been revised to utilize separate paths from the fire <br />alarm room to the Stair 1 enclosure as follows: wiring runs within conduit attached to the parking garage <br />ceiling utilizing 2-hour fire rated wire within metallic raceway thus maintaining the required separation <br />and protection of the wiring. <br />The construction team will assemble smoke control O&M, design, and test documents for transition to <br />the building operations team. <br />Based on the findings above and by personal knowledge and on -site observation, the stair pressurization <br />systems for Stair 1 and Stair 2 of Four Corners Building E have been satisfactorily tested as documented <br />in this report and the attached test forms. <br />Prepared by: <br />Allen Engineering, PILL <br />Travis <br />Member <br />Smoke mntrolspecial iiu'peRion Final <br />Attachments: Test forms <br />E Engineering Your Success 3 <br />