My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7800 EVERGREEN WAY HYUNDAI Wetland Report 2025-08-05
>
Address Records
>
EVERGREEN WAY
>
7800
>
HYUNDAI
>
Wetland Report
>
7800 EVERGREEN WAY HYUNDAI Wetland Report 2025-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2025 8:23:16 AM
Creation date
8/5/2025 8:21:34 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7800
Tenant Name
HYUNDAI
Address Document Type
Wetland Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX C <br />REPORT LIMITATIONS AND GUIDELINES FOR USE' <br />This appendix provides information to help you manage your risks with respect to the use of this report. <br />Geotechnical Services Are Performed for Specific Purposes, Persons and Projects <br />This report has been prepared for the exclusive use of LMJ Enterprises and other project team members <br />for the proposed Lee Johnson Hyundai Dealership improvements in Everett, Washington. This report is not <br />intended for use by others, and the information contained herein is not applicable to other sites. <br />GeoEngineers structures our services to meet the specific needs of our clients. For example, a geotechnical <br />or geologic study conducted for a civil engineer or architect may not fulfill the needs of a construction <br />contractor or even another civil engineer or architect that are involved in the same project. Because each <br />geotechnical or geologic study is unique, each geotechnical engineering or geologic report is unique, <br />prepared solely for the specific client and project site. Our report is prepared for the exclusive use of our <br />Client. No other party may rely on the product of our services unless we agree in advance to such reliance <br />in writing. This is to provide our firm with reasonable protection against open-ended liability claims by third <br />parties with whom there would otherwise be no contractual limits to their actions. Within the limitations of <br />scope, schedule and budget, our services have been executed in accordance with our Agreement with the <br />Client and generally accepted geotechnical practices in this area at the time this report was prepared. This <br />report should not be applied for any purpose or project except the one originally contemplated. <br />A Geotechnical Engineering or Geologic Report Is Based on a Unique Set of Project -specific <br />Factors <br />This report has been prepared for LMJ Enterprises for the proposed Lee Johnson Hyundai Dealership <br />improvements in Everett, Washington. GeoEngineers considered a number of unique, project -specific <br />factors when establishingthe scope of services for this project and report. Unless GeoEngineers specifically <br />indicates otherwise, do not rely on this report if it was: <br />■ Not prepared for you, <br />■ Not prepared for your project, <br />■ Not prepared for the specific site explored, or <br />■ Completed before important project changes were made. <br />For example, changes that can affect the applicability of this report include those that affect: <br />■ The function of the proposed structure, <br />■ Elevation, configuration, location, orientation or weight of the proposed structure, <br />■ Composition of the design team, or <br />■ Project ownership. <br />1 Developed based on material provided by ASFE, Professional Firms Practicing in the Geosciences, www.asfe.org. <br />GEOENGINEER� December 6, 2021 Page C-1 <br />File No. 24 59-003-00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.