Laserfiche WebLink
e0l, ARCXIS DPIS Pre-Final Blower 95987th Ave SE <br /> Door Everett, WA 98208 <br /> Status <br /> ,PaSj& M <br /> Scheduled Date Completed Date <br /> 8/12/2024 8/12/2024 Brian Say-Wentz <br /> Builder Total Items Defects Failed Items <br /> Pacific Ridge Homes/ DR Horton Aff. (Seattle) 10 0 0 <br /> Community Plan Lot <br /> Chelsea Heights THF8 / 35 On site No Complete No <br /> B / R <br /> Superintendent Superintendent PO# WO# <br /> Team Cathcart verify 201742 ON 831154 <br /> Phone Inspection Inspection <br /> Superintendent Attended No Number 1 <br /> Qj <br /> o <br /> a, o <br /> > <br /> }' o <br /> o C <br /> U_ m <br /> N Lo <br /> o <br /> _G <br /> >o CMC <br /> N o <br /> fi <br /> o <br /> Gi C <br /> J N <br /> fD <br /> Construction Status <br /> I <br /> VERSION:3.1 REFERENCE:2105875 <br /> Page 1/2 <br />