Laserfiche WebLink
H-R-HORMN' <br /> Pacific Ridge Series <br /> R.F.I. - ENGINEERING <br /> THELON B CHELSEA HEIGHTS LOT 35 CITY OF EVERETT <br /> Pacific Ridge Homes Issued By: Jason Atkin <br /> 17921 Bothell-Everett Hwy Suite 100 Bothell WA 98012 Date Requested: 6/12/2024 <br /> Phone: (425)438-8444 <br /> SUBJECT: Header Over Wer Grounding Rod <br /> DESCRIPTION: <br /> The ufer grounding rod was placed where the(4)2x6 post that the GLB in the garage sits on.We are requesting that a 4x10 header with(3) <br /> 2x6's on either side of the grounding rod be installed,as shown below. <br /> SOLUTION: <br /> Install a 5.5x9 GLB directly under the 16.5"floor GLB beam with a max length of 4 feet. Locate the new GLB header centered under the beam <br /> with(3)2x6's each side. <br /> _ 4 III <br /> r.•,• q S08 +6 <br /> �- '� •` 5%2x16%2 GLB(DROPPED) <br /> CS16x3'-0"- <br /> PLATE TO PLATE <br /> -j <br /> P� 6 <br /> APPROVED <br /> By Ryan Hartman at 3:47 pm, Jun 12, 2024 <br /> Thank you, ♦� <br /> Brian Lampe,P.E.,S.E. <br /> BTL Engineering <br /> ENG <br /> STT 19011 Wood-Sno Road NE,Suite 100 <br /> 1 1J Woodinville,WA 98072-4436 <br /> Phone:(425)814-8448 <br /> i Fax:(425)821-2120 <br /> RFI Thelon B 2018 2024 6-12 Header Over Ufer Grounding Rod 1 of 1 6/12/2024 <br />