Laserfiche WebLink
i <br /> E <br /> ❑ Duplex and Triplex:not meeting front porch and entrance ❑Review Process II. Complete this <br /> requirements of EMC 19.08.050 checklist and submit with a mailing <br /> ❑ Historic overlay zones:not meeting design standards of historic list for REVII process with your <br /> i overlay zone application. <br /> ❑ Detached ADUs:design fails to give appearance that the ADU is <br /> E <br /> secondary to principal dwelling <br /> i <br /> ❑Siding, roofing, windows and building trim do not visually match <br /> those of the principal dwelling <br /> ❑ Roof pitch not similar to predominant roof pitch on the principal <br /> dwelling <br /> 4) ❑ Owner Occupancy Required. Attach the following documents to <br /> I Within the R-S, R-1 and R-2 zones, either the principal dwelling unit your application if within R-S, R-1 <br /> or R-2 zones: <br /> or the ADU shall be occupied by the owner of the property as his or <br /> her principal residence. Prior to issuance of a permit for an accessory ❑ Complete and attach the <br /> dwelling unit,the property owner shall submit to the City a signed Accessory Dwelling Unit Covenant if <br /> affidavit affirming that the owner occupies the principal dwelling as located within a R-S, R-1 or R-2 <br /> his or her principal residence and will occupy either the principal zone. <br /> dwelling or accessory dwelling after completion of the accessory Do NOT record document until <br /> dwelling unit.The owner shall record a covenant with the instructed by Planning Staff. <br /> Snohomish County Auditor, approved by the director,that shall run <br /> with the land as long as the ADU is maintained on the property.The <br /> property owner shall submit proof that the covenant has been <br /> i <br /> recorded with the Snohomish County Auditor's office prior to <br /> issuance of the building permit. <br />! 5) ❑The owner agrees and acknowledges the following: Owners Initials JS <br /> a.An ADU shall not be segregated from the ownership of the <br /> principal dwelling through a subdivision, condominium, or any <br /> other process. <br /> b. Only one ADU is permitted on a lot. <br /> I <br /> 6)© Owner Occupancy Certificate--Due April V of each year. <br /> Owners Initials <br /> If located within the R-S, R-1 and R-2 zones,the property owner shall <br /> certify to the City no later than April 1st of each year that the owner <br /> occupies one of the dwellings as his or her principal residence.Any ❑ Complete and attach the Owner <br /> person who fails to report or falsely certifies that he or she resides in Occupancy Certificate form. A new <br /> a dwelling unit at the stated address shall be subject to the certificate is due on April 15t of each <br /> enforcement and penalty provisions of EMC Chapter 1.20. Year. <br /> - Page 2 of 5 <br /> Accessory Dwelling Unit Checklist <br /> EVERETT <br />