Laserfiche WebLink
PUBLIC ✓ORKS PERMIT Date Applied: 4/27/2021 <br />� City of Everett Permit Services <br /> Public Works Permit#: PW2104-066 <br /> 1d Associated Bldg Permit#: BW2011-004 <br /> EVERETT 3200 Cedar Street, 2 Floor <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $128.71 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> STEPHANSON JOSEPH STEPHANIE LOFQUIST <br /> 2216 GRAND AVE <br /> EVERETT,WA,98201-2712 , <br /> PHONE:2065959401 <br /> PHONE:4257618527 <br /> TAX PARCEL ID#:00439148302500 SITE ADDRESS:2216 GRAND AVE <br /> DESCRIPTION: PAVE PARKING PAD FOR ADU <br /> MINIMUM DIMENSIONS OF PARKING PAD SHALL BE 18.5'X 8.5'. PAD SHALL BE PAVED(GRAVEL NOT PERMITTED). <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 4/27/2021.Approved plans <br /> must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the Cit 's Online Permitting Portal at w.everettwa. ov to formal) <br /> p q g Y g p g Y <br /> request all required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector. Remove <br /> upon completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud,rocks,or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as directed by the <br /> City PW Inspector. <br /> 10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be <br /> managed on-site in a manner that does not adversely affect neighboring properties,including the City's right-of-way and/or easements <br /> and the improvements located therein. <br /> 11. Minimum dimensions of parking pad shall be 18.5'x 8.5'. Pad shall be paved(gravel not permitted). <br /> 12.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br /> selecting PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items <br /> have been completed. a a n n <br /> [E <br /> Public Works Permit Fee Breakdown: U <br /> Paving(166SF).............................................$45.00 <br /> PW Plan Review..........................................$20.00 MAY 10 2021 <br /> PW Site Inspection......................................$20.00 <br /> Stormwater System Development Fee........$43.71 CITY OF EVERETT <br /> City of Everett Official Use Only ReH1I WI$IIJ4;VV J OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> may arise because of installation and maintenance of the <br /> .544&a �47 0d 4/27/2021 improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAYBE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> YI �V <br />