Laserfiche WebLink
'ION REPORT INSPECTION REPORT INSPECTION REPORT <br />�j Permit: <br /> �Sd d�`� Date 'QM jib_ Permit: 6W 1412, Date 's l r�_ - Permit: �1/�/�S�✓���7 <br /> Contractor: y, Contractor: <br /> - - - Owner: -`! h � lvf'I Owner: — Y7 <br /> Site Address: 21 c);—? n _ Site Address: 21 d Z Gf 4ye <br />:TION REQUESTEEDD <br /> MECHANICAL TYPE OF INSPECTION REQUESTED TYPE OF INSPECTION REQUESTED <br /> PLUMBING ELECTRICAL BUILDING MECHANICAL PLUMBING ELECTRICAL BUILDING MECHANICAL PLUMBING <br />❑Groundwork/Slab ❑Groundwork/Slab <br />❑Rough In ❑Temp Service LIFER ground ❑Groundwork/Slab roun work/Slab ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Rough In ❑Groundwork ❑Footing ❑Rough In ough In Groundwork Footing Rough In Rough In <br />❑Ceiling Grid � ❑ ❑ g ❑ g ❑ g <br /> ❑Ceiling Grid ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid ❑Slab/Conduit Foundation CeilingGrid CeilingGrid <br />❑OK to insulate ❑OK to insulate ❑ ❑ ❑ <br />❑Rooftop Units Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Water Service ❑Service ❑Framing ❑Rooftop Units ❑Water Service ervice ❑Framing ❑Rooftop Units ❑Water Service <br />❑Mechanical Final ❑Medical Gas <br /> ❑Grounding ❑Insulation ❑Mechanical Final El Medical Gas rounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> GAS PIPE ❑Plumbing Final ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br />]Rough In/Service ❑Electrical Final ❑Shear Nailing GAS PIPE ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> g Hot Water Tank <br />]Refrigeration SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Rough in ❑Footing drains ❑CeilingGrid ❑Refrigeration Rough in <br />]Gas Pipe Final 9 ❑ 9 ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑HWT Final Roof drains Building Final Gas Pipe Final HWT Final <br />� ❑ ❑ 9 ❑ P ❑ ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br />, �— OTHER OR CONSULTATION: 4Z _ OTHER OR CONSULTATION: <br /> 1-7 71 2 ZS. 353. �822 <br /> L FINAL APPROVAL THIS PERMIT <br /> IUESTED ❑ APPROVAL .PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT ❑ APPROVAL ARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ OK FOR T.C.O. !� RECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION ❑ OK FOR C.O. 'VIOLATION <br /> A hour notice required ❑ UNABLE TO PERFORM INSPECTION: ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> l� <br /> Date: 7i 01 IFp Inspector:Inspector: Date: Ins actor: Date: <br /> DATABAR,INC. EIR(10/06) 0 DATABAR,INC. EIR(10/06) DATABAR,INC. <br />