My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2102 GRAND AVE 2025-09-11
>
Address Records
>
GRAND AVE
>
2102
>
2102 GRAND AVE 2025-09-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2025 12:01:27 PM
Creation date
8/6/2025 3:29:03 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2102
Permit
CW1412-006
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'ION REPORT INSPECTION REPORT INSPECTION REPORT <br />�j Permit: <br /> �Sd d�`� Date 'QM jib_ Permit: 6W 1412, Date 's l r�_ - Permit: �1/�/�S�✓���7 <br /> Contractor: y, Contractor: <br /> - - - Owner: -`! h � lvf'I Owner: — Y7 <br /> Site Address: 21 c);—? n _ Site Address: 21 d Z Gf 4ye <br />:TION REQUESTEEDD <br /> MECHANICAL TYPE OF INSPECTION REQUESTED TYPE OF INSPECTION REQUESTED <br /> PLUMBING ELECTRICAL BUILDING MECHANICAL PLUMBING ELECTRICAL BUILDING MECHANICAL PLUMBING <br />❑Groundwork/Slab ❑Groundwork/Slab <br />❑Rough In ❑Temp Service LIFER ground ❑Groundwork/Slab roun work/Slab ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Rough In ❑Groundwork ❑Footing ❑Rough In ough In Groundwork Footing Rough In Rough In <br />❑Ceiling Grid � ❑ ❑ g ❑ g ❑ g <br /> ❑Ceiling Grid ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid ❑Slab/Conduit Foundation CeilingGrid CeilingGrid <br />❑OK to insulate ❑OK to insulate ❑ ❑ ❑ <br />❑Rooftop Units Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Water Service ❑Service ❑Framing ❑Rooftop Units ❑Water Service ervice ❑Framing ❑Rooftop Units ❑Water Service <br />❑Mechanical Final ❑Medical Gas <br /> ❑Grounding ❑Insulation ❑Mechanical Final El Medical Gas rounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> GAS PIPE ❑Plumbing Final ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br />]Rough In/Service ❑Electrical Final ❑Shear Nailing GAS PIPE ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> g Hot Water Tank <br />]Refrigeration SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Rough in ❑Footing drains ❑CeilingGrid ❑Refrigeration Rough in <br />]Gas Pipe Final 9 ❑ 9 ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑HWT Final Roof drains Building Final Gas Pipe Final HWT Final <br />� ❑ ❑ 9 ❑ P ❑ ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br />, �— OTHER OR CONSULTATION: 4Z _ OTHER OR CONSULTATION: <br /> 1-7 71 2 ZS. 353. �822 <br /> L FINAL APPROVAL THIS PERMIT <br /> IUESTED ❑ APPROVAL .PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT ❑ APPROVAL ARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ OK FOR T.C.O. !� RECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION ❑ OK FOR C.O. 'VIOLATION <br /> A hour notice required ❑ UNABLE TO PERFORM INSPECTION: ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> l� <br /> Date: 7i 01 IFp Inspector:Inspector: Date: Ins actor: Date: <br /> DATABAR,INC. EIR(10/06) 0 DATABAR,INC. EIR(10/06) DATABAR,INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.