My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2102 GRAND AVE 2025-09-11
>
Address Records
>
GRAND AVE
>
2102
>
2102 GRAND AVE 2025-09-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2025 12:01:27 PM
Creation date
8/6/2025 3:29:03 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2102
Permit
CW1412-006
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 12/26/2018 12/26/2018 BLDG 08-FRAMING DAVE FOSTER PARTIAL <br /> APPROVAL <br /> Notes: <br /> Lower floor only. <br /> 1/2/2019 1/2/2019 BLDG 08-FRAMING DAVE FOSTER APPROVAL <br /> Notes: <br /> 1/2/2019 1/2/2019 BLDG 11- DAVE FOSTER PARTIAL <br /> INSULATION APPROVAL <br /> Notes: <br /> 1st level only,ok to cover. <br /> 3/15/2019 3/15/2019 BLDG 09-DRYWALL DAVE FOSTER PARTIAL <br /> NAILING APPROVAL <br /> Notes: <br /> Late AM inspection requested. <br /> Phone:425-353-1822 <br /> (3/15/2019 1:58 PM DWF) <br /> Basement level sheet rock ceiling ok to install 2nd layer after fire taping and fill holes. <br /> 2nd layer needs to have offset. <br /> 4/4/2019 4/4/2019 BLDG 09-DRYWALL TED DE BUDDEN PARTIAL With Corrections Required <br /> NAILING APPROVAL <br /> Notes: <br /> AM inspection requested <br /> Phone:425-353-1822 <br /> (4/4/2019 3:17 PM TMB) <br /> 1.Lower Apartment unit Ceiling Ok <br /> two layers GWB and RC channel installed. <br /> 2.Provide drawings for deck construction. Unable to approve concrete placement without approved drawings. <br /> 3.Provide revisions for proposed garage re-construction. <br /> 9/24/2019 9/24/2019 BLDG 14-OTHER I DAVE FOSTER OTHER <br /> Notes: <br /> 425-353-1822 Daniel <br /> (9/24/2019 11:28 AM DWF) <br /> Consultation on construction progress. <br /> Finishing work on lower unit only at this time. <br /> 12/20/2019 12/20/2019 GAS 01-ROUGH IN SHELLIE PONS APPROVAL <br /> Notes: <br /> Daniel:425-353-1822 <br /> (12/20/2019 2:03 PM SDP) <br /> Gas pressure test/60#on a 250#guage. <br /> Ok for service. <br /> I <br /> Printed:Thursday,24 July, 2025 3 of 6 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.