Laserfiche WebLink
p p T <br /> MLK.5— _ — — _ — — — — _ — _ _ — _ _ — — <br /> DEMO AND REPLACE <br /> PIPE SEGMENT SHOWN <br /> AT THE FOOTING. <br /> --(E)4"Iw <br /> (E)4'IW (E)4"IW <br /> DEMO(E)IW BACK TO <br /> DEMO(E)IW BACK TO MAIN AND CAP AT END. <br /> MAIN AND CAP AT END. <br /> —r <br /> I I I I I I I <br /> w <br /> II <br /> I I I I I II I <br /> - II <br /> — DEMO(E)3"IW UP TO(E)SINK <br /> — — — — — — — — <br /> DEMO(E)3"IW BACK TO POINT <br /> INDICATED,PREPARE FOR <br /> RECONNECTION TO NEW BRANCH <br /> fi rT <br /> I <br /> ill , <br /> I I I I I I <br /> p P <br /> 1 FOUNDATION DEMOLITION PLAN - QUADRANT 1 <br /> 2.1-MB SCALE: 1/8"=V-0" <br /> NO. DATE REVISION KEY PLAN MCOB MAINTENANCE IMPROVEMENTS DRAWN:BSB PROJECT NO.:20-002 <br /> 1q)ff <br /> 6BE " "/Ns FACILITIES MASTERPLAN PHASE 3A DESIGNED:BSB DATE:APRIL 13,2021 <br /> 5 �r ° MAINTENANCE N 7100 HARDESON ROAD,EVERETT WA 98203 CHECKED:LWB ITB#2021.011 <br /> 1601 5th Avenue,Suite 1600 1736 �Q' �N DRAWING NO.: R Seattle,WA 98101 9��FS Q q PLUMBING DEMOLITION FOUNDATION PLAN -QUADRANT 1 M2 1 -M B <br /> 206.622.5822 S/ONA L EN Page 217 of 3fi3 ■ <br /> W W W.Ikpffxonn BOGARD ENGINEERS,PS SUS WASH FUELING ISLAND -- <br />