GENERAL NOTES: ARCHITECTURAL SYMBOLS ABBREVIATIONS L ANGLE NSUL INSULATION
<br /> 1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND COORDINATE THE WORK OF ALL
<br /> TRADES INVOLVED IN THE PROJECTAS PART OF THIS CONTRACT. I
<br /> 2. DO NOT SCALE THESE DRAWINGS.DUE TO REPROGRAPHICS PROCESSES THESE & AND TNT INTERIOR
<br /> DRAWINGS MAY NOT BE TO SCALE.CONTACT ARCHITECT FOR ANY NEEDED NORTH ARROW AS ANCHOR BOLT
<br /> CLARIFICATION. ACT ACOUSTICAL CEILING TILE JAN JANITOR
<br /> 3. CONTRACTOR SHALL VERIFY CONDITIONS AT THE SITE AND REPORT ALL DISCREPANCIES NORTH ADD ADDENDUM JT JOINT
<br /> TO THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. A.F.F. ABOVE FINISH FLOOR JST JOIST
<br /> 4. CONTRACTOR SHALL PROVIDE A COMPLETE AND PROPER EXECUTION OF THE WORK AS ALS AREA LIGHT STANDARD L LENGTH
<br /> INDICATED ON ALL DRAWINGS AND SPECIFICATIONS.IF DISCREPANCIES IN LAYOUT, DIMENSIONAL CONTROL ALUM ALUMINUM LAV LAVATORY
<br /> DIMENSIONS,OR DETAILS ARE FOUND BETWEEN ARCHITECTURAL,STRUCTURAL, ANOD ANODIZED LB LAG BOLT
<br /> MECHANICAL,ELECTRICAL,CIVIL OR LANDSCAPE DRAWINGS,CONTACT THE ARCHITECT LKR LOCKER
<br /> IMMEDIATELY FOR CLARIFICATION BEFORE PROCEEDING. BC BOTTOM OF CURB LS LANDSCAPING
<br /> 5. REGULATIONS,STANDARDS,CONSTRUCTION,MATERIALS AND REQUIREMENTS FOR BD BOARD LVR LOUVER
<br /> INSTALLATION OF MATERIALS SHALL CONFORM AND BE GOVERNED BY THE EDITION OF 0 a-- GRIDS BLDG BUILDING
<br /> THE CODE IDENTIFIED IN THE CODES SHEET OF THESE DRAWINGS. B M. BLOCKING MAT'L MATERIAL
<br /> 6. REFERENCING DRAWINGS IS FOR CONVENIENCE ONLY AND DOES NOT LIMIT APPLICATION B.M. BENCH MARK MAX MAXIMUM
<br /> FOR DRAWINGS OR DETAILS. 0 BM BEAM MB MARKERBOARD
<br /> 7. MATERIALS AND FINISHES LISTED ON INTERIOR AND EXTERIOR ELEVATIONS ARE FOR BOT BOTTOM MECH MECHANICAL
<br /> GENERAL INFORMATION AND CONVENIENCE OF THE CONTRACTOR AND ARE REFERENCED BTU BRITISH THERMAL UNIT MED MEDIUM
<br /> IN ADDITION TO MATERIALS AND FINISHES INDICATED OR SPECIFIED ELSEWHERE IN THE _ Name LEVEL DATUM MFR BNIN BETWEEN MEZZ MEZZANINE
<br /> DOCUMENTS. Elevation MANUFACTURER
<br /> 8. HEIGHT DIMENSIONS ARE GIVEN FROM FINISHED SLAB WHERE INDICATED,OR RELATIVE C OR C CHANNEL MH MANHOLE
<br /> TO DATUM NOTED ON DRAWINGS. CB CATCH BASIN MIN MINIMUM
<br /> 9. N.I.C.EQUIPMENT IS FURNISHED AND INSTALLED BY OTHERS.CONTRACTOR IS rt- CENTERLINE MARK CCTV CLOSED CIRCUIT TV MIR MIRROR
<br /> RESPONSIBLE FOR COORDINATING INSTALLATION AND PERFORMING WORK AS REQUIRED CG CORNER GUARD MISC MISCELLANEOUS
<br /> BY DETAILS OR SPECIFICATIONS FOR EQUIPMENT INSTALLATION. I SPOT ELEVATION-CROSSHAIR C.I.P. CAST IN PLACE MTD MOUNTED
<br /> 10.F.O.I.C.EQUIPMENT IS FURNISHED BY OTHERS AND INSTALLED AS PART OF THIS WORK. T CLG CEILING MTL METAL
<br /> THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE WORK AS REQUIRED FOR CLR CLEAR
<br /> INSTALLATION. h CJ CONTROL JOINT NA NOT APPLICABLE
<br /> 11.CONTRACTOR SHALL SEAL AROUND ALL PENETRATIONS FOR FIRE RATED WALLS, Y SPOT ELEVATION-TARGET FILLED CMU CONCRETE MASONRY UNIT NIC NOT IN CONTRACT
<br /> INCLUDING BUT NOT LIMITED TO PIPING,DUCT,CONDUIT,ETC.WITH FIRE STOPPING PER CONT CONTINUOUS NOM NOMINAL
<br /> CODES THAT GOVERN THIS SET OF DOCUMENTS. Label LOCATION&LABEL CORR CORRIDOR NS NELSON STUD
<br /> 12.CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF THE VAPOR BARRIER MEMBRANE AT CS.J CONSTRUCTION JOINT NITS NOT TO SCALE
<br /> THE FLOOR SLAB,WALLS,AND ROOF.BACKER ROD,SEALANT,AND OTHER APPROVED CSMT CASEMENT
<br /> MEANS SHALL BE APPLIED CONTINUOUSLY AROUND ALL EXTERIOR DOORS,WINDOW --------------------------- CT CERAMIC TILE OA OVERALL
<br /> PENETRATIONS,AND OTHER AREAS OF POTENTIAL AIR INFILTRATION,INCLUDING DRAWING CALLOUT TYPES CTR CENTER OC ON CENTER
<br /> STRUCTURAL,MECHANICAL,AND ELECTRICAL PENETRATIONS.THE CONTRACTOR SHALL CL CENTERLINE O.D. OVERFLOW DRAIN
<br /> REPAIR ANY DAMAGE TO VAPOR BARRIER OR REPLACE THEM PRIOR TO COVER,AS OD OUTSIDE DIAMETER
<br /> APPROVED. DEIL DOUBLE OH OVERHEAD
<br /> 13.THERMAL AND SOUND INSULATION IS INTENDED TO PROVIDE A CONTINUOUS ENVELOPE A3.01 1B EXTERIOR ELEVATION CALLOUT DT L DETAIL OPNG OPENING
<br /> AS INDICATED. OF DRINKING FOUNTAIN Opp
<br /> OPPOSITE
<br /> 14.ALLADATOILETS,URINALS,AND STALLS SHALL MEETTHE REQUIREMENTS OFTHE CODES 1A DIA DIAMETER OS OUTSIDE
<br /> THAT GOVERN THIS SET OF DOCUMENTS.ALL STANDARD(NON-ADA)TOILETS SHALL BE DIAG DIAGONAL
<br /> CENTERED IN STALLS OR PARTITIONS,AS APPLICABLE,UNLESS OTHERWISE NOTED. DIM DIMENSION PIP POURED IN PLACE
<br /> 15.WHERE EXTERIOR CONCRETE WALKS AND LANDINGS ABUT BUILDINGS,THEY SHALL BE 1D A5.01 iB INTERIOR ELEVATION CALLOUT DISP DISPENSER Pi PANEL JOINT
<br /> SLOPED AWAY FROM THE BUILDING AS NOTED,BUT IN NO CASE LESS THAN.126/12". ON DOWN PL PROPERTY LINE
<br /> 16.MAINTAIN NOTED SLAB THICKNESS AT ALL RECESSED SLAB AREAS AND SLOPING SLABS. DP DAMPROOFING PLAS PLASTER
<br /> 17.ALL FOAM PLASTIC INSULATION TO COMPLY WITH THE SURFACE BURNING 1C DR DOOR PLYWD PLYWOOD
<br /> CHARACTERISTICS DEFINED BY THE CODE THAT GOVERNS THIS SET OF DOCUMENTS. DS DOWN SPOUT PREFINPREFINISHED
<br /> Al IA101 INTERIOR ELEVATION DT DRAIN TILE PSF PER SQUARE FOOT
<br /> 18.SPECIAL INSPECTIONS SHALL BE PROVIDED AS REQUIRED BY THE JURISDICTION THAT
<br /> GOVERNS THIS SET OF DOCUMENTS.SEE SPECIFICATION SECTION 014523 FOR CALLOUT-ALTERNATE DWG DRAWING P.T. PRESSURE TREATED
<br /> ADDITIONAL INFORMATION. PVMT PAVEMENT
<br /> 19.DRAWING KEYNOTES DO NOT CORRELATE DIRECTLY TO INDIVIDUAL SPECIFICATION 1/A101 DRAWING REFERENCE EA EACH
<br /> SECTIONS. - EF EXHAUST FAN R. RADIUS
<br /> 20.IT SHALL BE THE SPECIFIC DUTY AND RESPONSIBILITY OF EACH TRADE AND SUPPLIER TO EJ EXPANSION JOINT R.D. ROOF DRAIN
<br /> EXAMINE ALL PROJECT DRAWINGS,DETAILS,AND SPECIFICATIONS AND TO PROVIDE AND ) 1 CALLOUT EL ELEVATION REF REFERENCE
<br /> FURNISH PROPER EQUIPMENT,HARDWARE,FIXTURES,MATERIALS,ETC.,PERTAINING TO A101 ELEC ELECTRICAL REFR REFRIGERATOR
<br /> THEIR PART OF THE WORK SHOWN OR LISTED IN ANY PART OF THESE DOCUMENTS. I`_�) E.O.S. EDGE OF SLAB REQ'D REQUIRED
<br /> QUALITY CONTROL,ADVERSE MATERIAL REACTIONS,AND COMPLIANCE TO INDUSTRY ENGR ENGINEER REV REVISE OR REVISION
<br /> STANDARD WORKMANSHIP ARE THE RESPONSIBILITY OF THE CONTRACTOR.SCHEDULES EP ELECTRICAL PANEL RM ROOM
<br /> ARE FOR THE CONVENIENCE OF THE CONTRACTOR TO ASSIST THEM IN UNDERSTANDING EQ EQUAL R.O. ROUGH OPENING
<br /> AND CONSTRUCTING THE PROJECT.ANY OMISSIONS OR CONTRADICTIONS IN THESE 1 SIM EQUIP EQUIPMENT RCP REFLECTED CEILING PLAN
<br /> DOCUMENTS SHALL BE CALLED TO THE ATTENTION OF THE ARCHITECT PRIOR TO BUILDING SECTION ES EACH SIDE
<br /> _ SUBMITTING A BID,BIDS RECEIVED SHALL BE CONSIDERED TO INCLUDE ALL ITEMS SHOWN A101 EW EACH WAY SB SMART BOARD
<br /> AND/OR SPECIFIED OR SCHEDULED FORA COMPLETE PROJECT.THE CONTRACTOR SHALL EXST EXISTING SC SOLID CORE
<br /> NOTE THAT THE WATERPROOFING DETAILS DO NOT ALWAYS REFLECT THE SIM (E) EXPANSION SECT SECTION
<br /> ARCHITECTURAL DETAILS AND ARE INTENDED TO SUPPLEMENT THE ARCHITECTURAL 1 EXT EXTERIOR SF SQUARE FOOT
<br /> DETAILS,NOT REPLACE THEM.INSTALLERS ARE TO BE CERTIFIED BY MANUFACTURERS' WALL SECTION SHTG SHEATHING
<br /> APPROVED WARRANTY REQUIREMENTS. A101 FA FIRE ALARM SHWR SHOWER
<br /> 21.BUILDING INSPECTION SHALL BE PERFORMED THROUGHOUT THE DURATION OF FBO FURNISHED BY OTHERS SHT SHEET
<br /> CONSTRUCTION.THE FREQUENCY OF INSPECTION IS IDENTIFIED IN THE CONTRACT. SIM FD FLOOR DRAIN SIM SIMILAR
<br /> INSPECTIONS WILL BE PERFORMED ON SITE.INSPECTIONS WILL BE DOCUMENTED AND 1 FDN FOUNDATION SJ SEISMIC JOINT
<br /> RECORDED AS DEEMED NECESSARY BY THE PROJECT ENGINEER. A101 DETAIL SECTION FE FIRE EXTINGUISHER SM SHEET METAL
<br /> 22.PROVIDE FIRE BLOCKING IN FURRED SPACES,STUD SPACES,AND OTHER CONCEALED FEC FIRE EXTINGUISHER CABINET SPEC SPECIFICATION
<br /> CAVITIES AS INDICATED AND AS FOLLOWS: FF FINISH FLOOR SQ SQUARE
<br /> a. FIRE BLOCK FURRED SPACES OF WALLS,AT EACH FLOOR LEVEL,AT CEILING,AND AT FFE FINISH FLOOR ELEVATION SS STAINLESS STEEL
<br /> NOT MORE THAN 96 INCHES O.C.WITH SOLID WOOD BLOCKING OR NONCOMBUSTIBLE BUILDING ELEMENTTAGS FIN FINISH STD STANDARD
<br /> MATERIALS ACCURATELY FITTED TO CLOSE FURRED SPACES. FL FLOOR STL STEEL
<br /> b. FIRE BLOCK CONCEALED SPACES OF WOOD-FRAMED WALLS AND PARTITIONS AT 00 0000.00 KEYNOTE REFERENCE FO FACE OF STOR STORAGE
<br /> EACH FLOOR LEVEL,AT CEILING LINE OF TOP STORY,AND AT NOT MORE THAN 96 Area name FOC FACE OF CONCRETE SUSP SUSPENDED
<br /> INCHES O.C.WHERE FIRE BLOCKING IS NOT INHERENT IN FRAMING SYSTEM USED, AREA NAME&SQUARE FOOTAGE FOF FACE OF FINISH
<br /> PROVIDE CLOSELY FITTED SOLID WOOD BLOCKS OF SAME WIDTH AS FRAMING 150 SF FOIC FURNISHED BY OWNER, T TEMPERED GLAZING
<br /> MEMBERS AND 24NCH NOMINAL THICKNESS. INSTALLED BY CONTRACTOR TC TOP OF CURB
<br /> c. FIRE BLOCK CONCEALED SPACES BETWEEN FLOOR SLEEPERS WITH SAME MATERIAL FOIO FURNISHED BY OWNER, TEL TELEPHONE
<br /> AS SLEEPERS TO LIMIT CONCEALED SPACES TO NOT MORE THAN 100 SQ.FT.AND TO ROOM NAME INSTALLED BY OWNER T&G TONGUE AND GROOVE
<br /> SOLIDLY FILL SPACE BELOW PARTITIONS. 101 ROOM NAME&NUMBER FOM FACE OF MASONRY THK THICK
<br /> d. FIRE BLOCK CONCEALED SPACES BEHIND COMBUSTIBLE CORNICES AND EXTERIOR FOS FACE OF STUD TJ TOOL JOINT
<br /> TRIM AT NOT MORE THAN 20 FEET O.C. NOTES FRT FIRE RETARDANT TREATED TP TOP OF PAVEMENT
<br /> 23,CONTRACTOR SHALL MAINTAIN THE EXISTING BUILDING AND EXISTING ROOF ASSEMBLIES FUG FOOTING TYP TYPICAL
<br /> WSR FURR FURRING TOP TOP OF(MATERIAL)
<br /> WEATHER TIGHT AND WATER TIGHT THROUGHOUT THE DURATION OF THE PROJECT. WALL TYPE
<br /> CONTRACTOR SHALL PROVIDE TEMPORARY PROTECTION AS NECESSARY TO MAINTAIN 11R TOP TOP OF PARAPET
<br /> WEATHER AND WATER TIGHTNESS AT ALL TIMES. 101 GA GAUGE TOS TOP OF STRUCTURE
<br /> 24.THE CONTRACTORSSHALL ASSUME THAT LEAD PAINT IS PRESENT ON ALL PAINTED O DOOR NUMBER GALV GALVANIZED
<br /> BUILDING COMPONENTS SCHEDULED FOR DEMOLITION.ALL WORK THAT MAY DISTURB O GB GRAB BAR UNFIN UNFINISHED
<br /> PAINT CONTAINING LEAD SHALL BE PERFORMED IN ACCORDANCE WITH 29 CFR 19 26.62 WINDOW TYPE GC GENERAL CONTRACTOR UNO UNLESS NOTED OTHERWISE
<br /> AND WAC 296-155-176,CONTRACT DOCUMENTS,AND CONTRACTOR'S APPROVED WORK 9-0. GL GLASS
<br /> CEILING ELEVATION FROM FLOOR LEVEL GNP GROUND VB VAPOR BARRIER
<br /> PLAN.REFER TO 02 83 00 LEAD-CONTAINING PAINT DISTURBANCE FOR DETAILS.
<br /> 25.LEAD-PAINTED COMPONENTS INCLUDE BUT ARE NOT LIMITED TO PAINT ON WALLS GVP GYPSUM VENEER PLASTER VEST VERTICAL
<br /> GYPSUM,CONCRETE,AND METAL WALLS AND CEILINGS,PAINT ON METAL AND WOOD O GWB GYPSUM WALL BOARD VEST VESTIBULE
<br /> ROOF ASSEMBLY TYPE VIF VERIFY IN FIELD
<br /> DOOR AND DOOR FRAMES,PAINT ON METAL AND WOOD WALL PANELS,PAINT ON METAL
<br /> HEATING COMPONENTS,PAINT ON METAL BEAMS AND FASCIA,AND PAINT ON WOOD HB HOSE BIB
<br /> HC HANDICAP W/ WITH
<br /> SIDING. LOCKABLE
<br /> 26.WASTE CHARACTERIZATION AND DISPOSAL REQUIREMENTS FOR ALL DEMOLITION DEBRIS 100 HDWR HARDWARE WC WATER CLOSET
<br /> SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS. CASEWORK TYPE HM HOLLOW METAL WD WOOD
<br /> 27.LEAD CONTROL PROCEDURES ARE NOT SPECIFIC REQUIREMENTS OF ONE SUB- H HW HOT WATER WF WIDE FLANGE
<br /> CONTRACTOR;THESE CONTROLS AND ASSOCIATED MONITORING REQUIREMENTS ARE HVAC HEATING,VENTILATION AND WIG WIRE GLASS
<br /> REQUIRED OF THE GENERAL CONTRACTOR AND ALL SUB CONTRACTORS WHO MAY AIR CONDITIONING WH WATER HEATER
<br /> DISTURB LEAD-CONTAINING PAINT. O MATERIAL MARK W/O WITHOUT
<br /> WP WATERPROOFING
<br /> WT WEIGHT
<br /> ---------------------------
<br /> Revisions
<br /> AA REVISION TAG
<br /> REVISION CLOUD
<br /> N0. DATE REVISION KEY PLAN 'N MCOB MAINTENANCE IMPROVEMENTS DRAWN:DDF PROJECT N0.:20002
<br /> 1Tff V"- DYKEMA �39 REGISERED d FACILITIES MASTERPLAN PHASE 3A DESIGNED:TPH DATE:APRIL 13,2021
<br /> 1 I ARCHITECT
<br /> MAINTENANCE
<br /> N N 7100 HARDESON ROAD,EVERETT WA 98203 CHECKED:KGS ITB#2021-011
<br /> ARCHITECTURE IDESIG
<br /> KELLI GARDIN ER SMITH
<br /> 1601 5th Avenue,Suite 1600 STATE OF WASHINGTON DRAWING NO.:
<br /> Seattle,WA 98101
<br /> 206.622.6822 Q q NOTES, SYMBOLS &ABBREVIATIONS
<br /> -kpff.mm auswASH FUEUNO ISLAND
<br /> Page 208 of 363 0■
<br />
|