Laserfiche WebLink
Q p N M L K.5 K <br /> m <br /> 3o <br /> N <br /> W <br /> a - - 36"x36"OPENING OPENING TO m - - - v - - �� �- _ _ 3 <br /> 1/M7.1-MB TO RH-3 ON ROOF GEF-2 ON ROOF_ -_ M _ - - <br /> ® - ��� ABOVE r - - - - - - , Noe <br /> ABOVE �IT'I I I I <br /> _ -I- - - - - - - - - - - - - - -I- - - - - � - <br /> MATCHLINE - - y� - - - - - - -10"0 EXH.UP TO' - - - - - - - - - - - - - - _ - - - - <br /> 1800 ROOF HOOD a o0 <br /> r� <br /> JONINEEE <br /> b L�J w rm, NO2 <br /> FOR EN €ma OPENING TO GEF-1 FOR ENLARGED PLAN z <br /> 8"0 UP TO EXH. - R -J - E <br /> WALL <br /> OF THE M 10"0 EXH.DN TO 7.6-M <br /> BREAK ROOM CEILING � ON ROOF ABOVE OF THE MEZZANINE SEEOPENING TO 2.a - - -SPACE--GEF-3 ON ROOF •�•�• ROOF ENECK ONHV-3 ON ROOFE I N 10"OOSAUPTOROOF EZZANINE HOOD DN TO BREAK 875 L30x30 UP,CONNECT •— <br /> HP-1 I ROOM CEILING SPACE DUCTS AND TRANSITION _ _ - ON MEZZANINEExIsrlNc M N <br /> SEE 2/M7.7-MB FOR ! HR-8 ® HR-9 TO 22x19 OPENING TO i <br /> I DETAIL ON MOUNTING OF , 1/4"LR <br /> HP-1 HR-7 HV-3 ON ROOF(TYP.2) <br /> 1/4"LR HP-2 DN'.SR <br /> 1/Z'SIR i MDN TO DN TO FC-2 BELOW <br /> 2 - - - - —BELOW— <br /> CLEARANCE i _ m _MINIMUM 21'-0" _ _6.7-M - _ ( _ _SEE 2/M7.7-MB FOR <br /> _ <br /> I ao CLEARANCE AT I DETAIL ON MOUNTING <br /> ! MEZZANINE FULL-SIZE OPENING BOTTOM OF DUCT OF HP-2 _ 10 0 EXH.DN <br /> I NEW eax36 DUCT TO -, I I <br /> �1® �z3� ' WITH MOTORIZED 8"0 UP TO EXH. HV-3 ON ROOF. m ME BELOW <br /> DAMPER TO RH-4 ON GOOSENECK TRANSITION DUCT TO N MEZZANINE <br /> 18001 ROOF ABOVE ON ROOF CONNECTION. w 10"0 OSA DN <br /> I VFD WITH NEMA 1 <br /> ENCLOSURE FOR ME BELOW <br /> i 8"0 UP TO EXH. L84'X36" <br /> L84"x36" I O I MEZZANINE <br /> i I t171 I EF-18 ON MEZZANINE <br /> ! : I - 10 0TO ERV 2 I WALL. <br /> GOOSENECK ON C <br /> t 6 ROOF I HV-4 ON ROOF_ _ _ _ _ _VFD WITH NEMA 1_ <br /> •�•�•�•�• 10'0 EXH.UP ENCLOSURE FOR GEF-1 ON <br /> 876 TO ERV-2 MEZZANINE WALL. �/FD WITH NEMA 1 <br /> MINIMUM 20' ° - I j I ENCLOSURE FOR <br /> _ _ 1 CLEARANCE AT L36"x2l) VFD WITH NEMA 1 ION <br /> BODY BOTTOM OF UCT BODY BAY 4/ 15 ' 1 ENCLOSURE FOR MEZZANINE <br /> NI <br /> BAY 6/ 6 6-M o (E)SPLIT-SYSTEM I MEZZANINE WALL. <br /> -_-PAINT m SHEET oo NT. 16 8"0 UP TO EXH. NEW MAINT. OUTDOOR UNIT , GEF-3 ON MEZZANINE <br /> BOOTH IN I METAL NEW MAINT. GOOSENECK <br /> Noz gqy ON ROOF, BAY w ON MEZZANINE -! II VFD WITH NEMA 1 <br /> I, BODY I I ENCLOSURE FOR GEF-0 (E)12"x12"UP, <br /> I (E)14"m <br /> y® BAY 5 HR-10 HR-it MINIMUM 2T-0" ON MEZZANINE WALL. CONNECT TO <br /> 1800 CLEARANCE AT I I I \ ! EF-25 ON <br /> 3 _ - BOTTOM OF DUCT FIELD VERIFY 21'-0� II ANEW VO IN I ROOF <br /> HR-12 CLEARANCE TO . I VERTICAL,CONNECT <br /> T — -- I � I � o BOTTOM OF(E)' TO(E)14"0 DUCT. <br /> 8"0 UP TO EXH, 6"0 UP TO EXH. I N DUCT FOR BUS LI <br /> GOOSENECK GOOSENECK _ <br /> ON ROOF ON ROOF 11®�- ® I BALANCE TO 700 CFM <br /> _ _ _ _ _ _ CONNECT TO EF-19 ON <br /> ROOF <br /> Q p N.5 N M L K.5 K <br /> W m <br /> Z <br /> J <br /> F <br /> HVAC FLOOR PLAN - QUADRANT 3 <br /> 7.3-MB SCALE: 1/8"=V-0" <br /> --- NO. DATE REVISION KEY PLAN MCOB MAINTENANCE IMPROVEMENTS DRAWN:BSB PROJECTNO.:20-002 <br /> 1 6BE "'"r4 6::= FACILITIES MASTERPLAN PHASE 3A DESIGNED:BSB DATE:APRIL 13,2021 <br /> N <br /> N N 7100 HARDESON ROAD,EVFRETT WA 98203 CHECKED:LWB ITB#2021-011 <br /> n > DRAWING 63 M 7 3-M B <br /> 1ea1e, Avenue,Suite1600 i"° Q �J HVAC FLOOR PLAN -QUADRANT 3 <br /> ' NO <br /> Seattle,WA 98101 �,,.'4Fai736 <br /> 208.622.6822 �Ss�ONAL ENS'\ Page 241 of 363 ■ <br /> x .xpN.00m BOQARD ENOINE6RS PS Due WMH FueuNo ISw D - <br />