My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7100 HARDESON RD 2021 Plans 2025-09-11
>
Address Records
>
HARDESON RD
>
7100
>
Plans
>
7100 HARDESON RD 2021 Plans 2025-09-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2025 1:44:11 PM
Creation date
8/7/2025 10:38:23 AM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7100
Permit
M2101-014
Year
2021
Notes
MECHANICAL FOR RENOVATION AND ADDITION - VEHICLE MAINT FAC
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J H G F.3 <br /> KEY NOTES <br /> LUBE HOSE SUPPORT TOWERS <br /> 9,-0» SEE SHEET A9.02-MB, D ILS C4 AND C5 O1 CONTRACTOR TO CONNECT COMPRESSED AIR SUPPLY TO NEW <br /> 9'-0" _I FOR DETAILS AND ADDITION L INFORMATION CONTROL CONSOLE (BY OTHERS). COMPRESSED AIR SUPPLY <br /> I LOCATIONS APPROXIMATE SHALL BE INSTALLED OVERHEAD FROM EXISTING LINE AT WALL. <br /> FIELD LOCATE CONTRACTOR TO INSTALL FRL UNIT AT NEW CONSOLE. <br /> O CONTRACTOR TO CONNECT SUMP PUMP IW DISCHARGE WITH <br /> EXISTING IW TRENCH DRAIN NEAR BAY DOOR. SEE SHEET <br /> MOVABLE LIFT I I <br /> M5.3-MB FOR DETAILS. <br /> D 13' TRAVEL RANGE O NEW LIFT CONTROL CONSOLE FROM STERTIL KONI SHALL BE <br /> SUPPLIED AND INSTALLED BY OWNER. BACK SIDE OF THE <br /> CONSOLE SHALL FACE THE CENTER LINE OF THE BAY, SO THAT <br /> THE OPERATOR IS FACING WEST WHILE OPERATING THE LIFT. <br /> ® CONTRACTOR TO INSTALL 4" PVC CONDUIT CHASES FOR <br /> HYDRAULIC LINES, PIPE INVERT 20" BELOW FINISHED FLOOR. <br /> CONNECT HYDRAULIC LINES PER MFR INSTRUCTIONS. 16" MIN <br /> BEND RADIUS. <br /> N CONTRACTOR TO INSTALL 3/4" RMC FOR INTRINSICALLY SAFE <br /> I I Q INCLINOMETERS, IN ACCORDANCE WITH STERTIL-KONI INSTALLATION <br /> DRAWINGS. <br /> LIFTS SHALL BE INSTALLED BY OWNER PER LIFT MANUFACTURER'S <br /> c� <br /> © INSTRUCTIONS. SEE STRUCTURAL DRAWINGS FOR LIFT PIT DETAILS. <br /> z <br /> 6 SUMP WITH AODD PNEUMATIC PUMP CONTROLLED BY PNEUMATIC <br /> O7 LIQUID LEVEL SENSOR. PUMP SUPPLIED AND INSTALLED BY <br /> 5 OWNER. <br /> a <br /> GENERAL NOTES <br /> o <br /> 1. CONDUITS®O AND SUMPO LOCATIONS ARE FOR <br /> REFERENCE ONLY. CONTRACTOR SHALL VERIFY LOCATION WITH <br /> z i \ STERTIL KONI LAYOUT DRAWINGS CREATED SPECIFICALLY FOR <br /> X THIS PROJECT. <br /> o \ 2. PIPING, LIFT LAYOUT, AND NOTES SHOWN ARE TYPICAL FOR ALL <br /> FOUR BAYS SHOWN <br /> \ <br /> z FIXED CENTER LIFT <br /> N \ 5 <br /> MOVABLE LIFT <br /> 17 TRAVEL RANGE - - - - <br /> I \ v <br /> \ <br /> \ 5 <br /> \ 4 <br /> 3 f <br /> C.A. POLY TUBE IN <br /> \ 4" PVC CHASE <br /> fl� HB <br /> , I ' H <br /> 1 <br /> BAY 5 BAY 4 BAY 3 1 7'-3" BAY 2 BAY 1 0 4 S 12 <br /> (EXISTING IN-GROUND LIFT) 9'-0" REF T-O" REF 2 OVERHEAD � FLOOR & FOUNDATION PLAN SCALE IN FEET <br /> CL BAY TRENCH 2" BELOW GRADE - SCALE: 1/4" = 1'-O" 1/4" = 1'-O" <br /> Kq NO. DATE REVISION KEY PLAN MCOB MAINTENANCE IMPROVEMENTS DRAWN: RB PROJECT NO.:20-002 <br /> 1 J~�gp4..sg�Gs �MELe FACILITIES MASTERPLAN PHASE 3A <br /> DESIGNED: PGH DATE: APRIL 13,2021 <br /> 7100 HARDESON ROAD, EVERETT WA 98203 CHECKED: DWH ITB#2021.011 <br /> 18015th Avenue,Suite 1800 o'P35s'50 � MECHANICAL INSTALLATION PLAN DRAWING NO.: <br /> -Seattle,WA 98107 �s7oxeL / O ,t M L 1 1 M B <br /> kpflscom �f/ - BAYS 1, 2, J, �F Page 264 of 363 <br />
The URL can be used to link to this page
Your browser does not support the video tag.