My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9570 7TH AVE SE 2025-09-30
>
Address Records
>
7TH AVE SE
>
9570
>
9570 7TH AVE SE 2025-09-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 11:03:12 AM
Creation date
8/7/2025 10:38:40 AM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
9570
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A Portion of Section 18,Township 28 North, Range 05 East,W.M. <br /> BMP'S TO BE APPLIED AS APPROPRIATE df <br /> N BMP's: C101 Preserving Natural Vegetation W <br /> N C105 Stabilized Construction Entrance <br /> C120 Temporary&Permanent Seeding <br /> C121 Mulching Z r> <br /> N <br /> Cl 23 Plastic Covering N <br /> C140 Dust Control O a N <br /> C150 Materials on Hand Z a a <br /> C151 Concrete Handling Z ¢'3 cy <br /> 10 <br /> C153 Material Delivery,Storage and Containment 44 -a o <br /> C160 Certified Erosion&Sediment Control Lead :aR 6 <br /> C220 Storm Drain Inlet Protection o.c <br /> C233 Silt Fencing �Q <br /> C234 Vegetated Strip 00 <br /> C235 Straw Wattles <br /> Z <br /> a <br /> I . s <br /> Construct Stabilized Temporary - `a <br /> Construction Entrance per City of NOTE: CD Leo z <br /> Everett Std Dwg 201 C151 -Concrete Washout Area designated in o e 6 <br /> centralized location. <br /> C 10 Confirm location with Superintendent on site. < <br /> C a <br /> s <br /> CITY OF EVERETT DESIGN AND CONSTRUCTION <br /> _ STANDARDS VOLUME 1 SECTION 2-5 STANDARD NOTES <br /> 1. Approval of this Erosion/Sedimentation Control(ESC) plan does not constitute an <br /> approval of permanent road or drainage design(e.g.,size and location of roads, e <br /> ,. pipes,restrictors,channels,retention facilities,utilities). `v <br /> l I 2. The implementation of these esc plans and the construction,maintenance, Z <br /> replacement,and upgrading of these esc facilities is the responsibility of the 0;:>- <br /> _ applicant/contractor until all construction is completed and approved and u z p <br /> vegetation/landscaping is established. o w Q y <br /> r� i '- 3. The boundaries of the clearing limits shown on this plan shall be clearly flagged in u o o <br /> 23 Cl 40 ,,y the field prior to construction.During the construction period,no disturbance <br /> 1° ^9 ot <br /> beyond the flagged clearing limits shall be permitted.The flagging shall be 3 <br /> C150 � ;, i maintained by the applicant/contractor for the duration of construction. <br /> 4. The ESC facilities shown on this plan shall be constructed in conjunction with all W <br /> CJ` clearing and grading activities and in such a manner as to ensure that sediment <br /> and sediment laden water do not enter the drainage system,roadways,or violate H <br /> applicable water quality standards. L a <br /> 5. The ESC facilities shown on this plan are the minimum requirements for anticipated 3 t <br /> Temporary Amended site conditions.During the construction period,these esc facilities shall be m 0 <br /> Soils Stockpile Area 55c�, upgraded as needed for unexpected storm events and to ensure that sediment = „ N <br /> and sediment-laden water do not leave the site. C3 w t <br /> 6. The ESC facilities shall be inspected routinely and maintained by the y <br /> applicant/contractor to ensure their continued functioning,especially al er storm Ln <br /> events. 77D t m <br /> 7. The ESC facilities on inactive sites shall be inspected and maintained a minimum of o <br /> once a month or within the 48 hours following a major storm event. U R <br /> m = I 8. At no time shall more than one foot of sediment be allowed to accumulate within 0, v <br /> a trapped catch basin.All catch basins and conveyance lines shall be cleaned <br /> t - prior to paving.The cleaning operation shall not flush sediment laden water into = U <br /> h I the downstream system. a <br /> 9. Stabilized construction entrances shall be installed at the beginning of construction ` L U <br /> u and maintained for the duration of the project.Additional measures may be ES F— <br /> co <br /> N required to ensure that all paved areas are kept clean for the duration of the a M <br /> o ; L project. U 3 CV <br /> 5 10.The contractor shall provide periodic street cleaning to remove debris and — } <br /> sediment tracked off the site. O <br /> 0 11.Appropriate measures shall be taken to stop sediment from entering surface water 0 J <br /> co <br /> bodies if the proposed BMPs fail.If BMPs fail and sediment-laden water is leaving o <br /> the site,immediately notify your public works inspector. <br /> 12.Bare and/or disturbed soils shall remain uncovered and/or unstabilized for no more <br /> than 2 days from October 1 through April 30 and for no more than 7 days from . <br /> o I 3 May 1 through September 30. <br /> y 13.Notify the city public works inspector at least 24 hours prior to dewatering activities. <br /> ! e Handle highly turbid or otherwise contaminated dewatering water separately from <br /> stormwater. U ; <br /> o 14.The approved project public works permit and SWPPP shall be retained on site or "= W <br /> 0 readily available to the contractor throughout the duration of the construction O o <br /> 0 project. 0 <br /> 15.Design,install,implement,and maintain effective pollution prevention measures to <br /> E minimize the discharge of pollutants. <br /> _ ` 16.Protect all lid BMPs from sedimentation through installation and maintenance of SHEET <br /> erosion and sediment control BMPs on portions of the site that drain into the lid C3 or C4 <br /> BMPs. <br /> U 0 10' „x,7 <br /> LOT 23 TESC PLAN Scale: 1"=10' - <br />
The URL can be used to link to this page
Your browser does not support the video tag.