My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9580 7TH AVE SE 2025-09-16
>
Address Records
>
7TH AVE SE
>
9580
>
9580 7TH AVE SE 2025-09-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2025 11:08:59 AM
Creation date
8/7/2025 1:58:42 PM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
9580
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A Portion of Section 18,Township 28 North, Range 05 East,W.M. <br /> BN P'S TO BE APPLIED AS APPROPRIATE au <br /> MP's: C 101 Preserving Natural Vegetation <br /> C 105 Stabilized Construction Entrance <br /> 1 i o C120 Temporary&Permanent Seeding C Ui <br /> C121 Mulching z <br /> C 123 Plastic CoveringMill <br /> I I I C140 Dust Control e a <br /> I I I I i C 150 Materials on Hand Z <br /> C151 Concrete Handling = <�04 <br /> C 153 Material Delivery,Storage and Containment V o g <br /> C 160 Certified Erosion&Sediment Control Lead IW 6.o <br /> C220 Storm Drain Inlet Protection <br /> i C233 Silt Fencing ~ <br /> C234 Vegetated Strip' C235 Straw Wattles = <br /> lid <br /> - Constrict Stabilize Temporary i I J <br /> Construction Entrance pe City of ` <br /> Everett Sid Dwg 201 ' a< <br /> ' NOTE: o <br /> C 10 i C 151 -Concrete Washout Area designated in o o <br /> centralized location. o <br /> i Confirm location with Superintendent on site. �+ y <br /> i < <br /> CONSTRUCTION SWPPP � -5 1 <br /> ' <br /> SSCO The lements that are part of a Construction SWPPP are as follows: <br /> o 0 0 0 0�✓ a <br /> %ESl¢.7 - r i 1. Mark Clearing Limits:Prior to clearing or disturbing the limits must be marked.This element 6 u <br /> 0 0 0 part of most normal construction plans as one of the first steps. <br /> i to� 2. Establish Construction Access:All erosion control plans shall install a stoblized construction z ' o <br /> 26 i entrance(or other method of preventing sediment transport onto the roads).If a standard G <br /> gravel construction entrance is proposed,use geo-textile fabric under the rock.Note:a R_W<1 <br /> C 140 ,1 V wheel wash ls required for plans that propose winter grading, ' a <br /> n o 0 o L _ o� o q Plo pr po gr ng. <br /> Temporary Amended C 150 3. Detain Flows:Based on a downstream analysis it may be necessary to detain runoff from a 3i <br /> Soils Stockpile Area site under construction.It may be necessary to construct and use a detention pond to w <br /> control flows duri construction. W <br /> o <br /> p � ao <br /> -,� ° --` 4. Instal Sediment Controls:If there is runoff from the construction site,sediment shall be <br /> removed from the water.Note that the water quality standards must be met. a <br /> �3 € <br /> 5. Stabilize Sots:All exposed and norr-worked sot shall be stabilized by use of BMP's.Note C <br /> i there are time periods of allowed exposure that depend on the season.Groundcover = > N <br /> both temporary and permanent need to be part of the construction plans. W <br /> i Qp p 6. Protect Slopes:Cut and fill slopes need to be protected from erosive flows and r <br /> i I concentrated flows until permanent cover and drainage conveyance systems are in <br /> / a I place. U o <br /> m Oo p Qp 7. Protect Drain Inlets:All storm drain inlets require protection from sediment and silt laden CL <br /> —— water. o U <br /> � 8. Stabilize Channels and Outlets:Temporary and permanent conveyance systems shot be a N <br /> O�� O stabilized to prevent erosion during and after construction.Culvert outlets require LJJ <br /> 0 \ I protection. co *�/� <br /> < V <br /> o 9. Control Pollutants:The plan shall show how al pollutants,including waste materials and J 3 CV <br /> O O demolition debris,will be handled.This includes maintenance of construction equipment, _J = .� <br /> o 0 0 0 0 fertilizers,application of chemicals,and water treatment systems. = L <br /> ®r" \ °m— — 10. Control De Watering:The water from de watering systems for trenches,vaults and�� Q O�O O O�O�O� foundations shot be discharged into a controlled system. <br /> 11. Maintain i BMPs:The plan shall provide for inspection and maintenance of the planned and instated construction BMPs as well as their removal at the end of the project. <br /> o 12. Manage the Project:The plan shall outline how the site shall be managed for erosion <br /> Del, <br /> Ocontrol and identify the management team.it needs to cover phasing,training, iO p portin .It shall conference,coordination with evisio and contractors,monitoring and Wa O�O O� Q Q Q Q Q Q Q Q Q Q Q Q \ Q Q Q T reporting.It shall provide for notice of problems,revisions during construction and U <br /> 0 0 0 0 0 0 0 0 0 o p p o o p p p o p contingency planning.One of the most important elements in the management of the o <br /> 0e, <br /> � Y �0 ���� �� project is planning for contingencies based on the risk of exposure during phases of the CL to <br /> development.It is essential that planning ls ongoing throughout the rife of the project. <br /> 0 _ O sV — Z� <br /> SD- —- ra 13. Protect on-Site stormwater management BMPs for runoff from roofs and other SHEEP <br /> --$�- C3 C4 <br /> —'n— So— or <br /> � �___ ___��___�„___sry---sn-- hard surfaces.On-site stormwater Management BMPs shall be protected at all <br /> 0 10, times during the construction process.This may mean that stormwater „X„ <br /> management BMPs will be installed towards the end of the construction process <br /> to avoid siltation and compaction. _ <br /> LOT 26 TESC PLAN - Scale: 1"=10' <br />
The URL can be used to link to this page
Your browser does not support the video tag.