My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3904 FEDERAL AVE B 2025-08-07
>
Address Records
>
FEDERAL AVE
>
3904
>
3904 FEDERAL AVE B 2025-08-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2025 3:42:53 PM
Creation date
8/7/2025 3:02:25 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
3904
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wind uplift on the panels has been calculated in accordance with the relevant provisions of ASCE 7-16. This loading <br /> has been used to verify the adequacy of the connection specified above. Connection locations should be in <br /> accordance with design drawings. <br /> Conclusion <br /> The roof structure need not be altered for either gravity or lateral loading. Therefore, the existing structure is <br /> permitted to remain unaltered. Connections to the roof must be made per the "Roof Connection Details" section <br /> above.Copies of all relevant calculations are enclosed. <br /> Limitations and Disclaimers <br /> The opinion expressed in this letter is made in reliance on the following assumptions:the existing structure is in good <br /> condition; the existing structure is free from defects in design or workmanship; and the existing structure was <br /> code-compliant at the time of its design and construction.These assumptions have not been independently verified, <br /> and we have relied on representations made by the property owner and his or her agents with respect to the <br /> foregoing.The undersigned has not inspected the structure for patent or latent defects. <br /> Electrical engineering is beyond the scope of this analysis. Solar panels must be installed per manufacturer <br /> specifications. Structural design and analysis of the adequacy of solar panels, racks, mounts, rails, and other <br /> components is performed by each component's respective manufacturer and the undersigned makes no statement <br /> of opinion regarding such components. This letter and the opinions expressed herein are rendered solely for the <br /> benefit of the permitting authority(city or county building department), and may not be utilized or relied on by any <br /> other party. <br /> If you have any questions or concerns, please contact our office at (509)-931-1663, or email me directly at <br /> Trevor.Jones@solgenpower.com. <br /> Sincerely, <br /> Trevor A.Jones, P.E. <br /> •SC4*wAsiyiNFs <br /> 4° - G>. <br /> i <br /> ,20114:.8 <br /> FSS/oNALENG\� <br /> 01/27/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.