Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 1/2/2018 1/2/2018 BLDG INSULATION DAVE FOSTER CORRECTION <br /> REQUIRED <br /> Notes: <br /> Complete framing corrections from previous inspection. <br /> 1/3/2018 1/3/2018 BLDG FRAMING DAVE FOSTER APPROVAL As noted <br /> Notes: <br /> Install seismic strapsto garage door header. <br /> 1/3/2018 1/3/2018 BLDG INSULATION DAVE FOSTER APPROVAL Post temp site address <br /> Notes: <br /> 2/12/2018 2/12/2018 BLDG 08-FRAMING DAVE FOSTER CORRECTION No access,see notes <br /> REQUIRED <br /> Notes: <br /> Need to post temp site address.2nd notice as per R319.1 <br /> 2/12/2018 2/12/2018 BLDG 11- DAVE FOSTER CORRECTION No access,see notes <br /> INSULATION REQUIRED <br /> Notes: <br /> Need to post temp site address.2nd notice as per R319.1 <br /> 2/22/2018 2/22/2018 BLDG 01- DAVE FOSTER OTHER <br /> CONSULTATION <br /> Notes: <br /> Need plumbing,mechanical,electrical finals. <br /> Complete handrailing and fire protection-garage ceiling box cover-pipe. <br /> 10/30/2018 10/30/2018 PERMIT EXTENSION CINDY BERGSMA APPROVAL <br /> Notes: <br /> 4/24/2019 4/24/2019 PERMIT EXTENSION TAWNYA APPROVAL 10/21/2019 <br /> HERMAN <br /> Notes: <br /> EXTEND DUE TO DELAYS <br /> 10/31/2019 10/31/2019 PERMIT EXTENSION TAWNYA APPROVAL extended to 04/27/2020 <br /> HERMAN <br /> Notes: <br /> 4/24/2020 4/24/2020 PERMIT EXTENSION KATHY COLLISON APPROVAL Due to COVID-19 <br /> Notes: <br /> 9/9/2020 9/9/2020 GAS 03-FINAL SHELLIE PONS APPROVAL <br /> Notes: <br /> 9/9/2020 9/9/2020 MECH 06-FINAL SHELLIE PONS APPROVAL <br /> Notes: <br /> I <br /> Printed: Friday,07 July,2023 3 of 5 <br /> SUPERION <br />