My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
200 W MARINE VIEW DR BAYWOOD Geotech Report 2025-08-11
>
Address Records
>
W MARINE VIEW DR
>
200
>
BAYWOOD
>
Geotech Report
>
200 W MARINE VIEW DR BAYWOOD Geotech Report 2025-08-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2025 11:40:28 AM
Creation date
8/11/2025 11:37:26 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
200
Tenant Name
BAYWOOD
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 16, 2020 <br /> Project No. T-8221 <br /> 111 <br /> With a stable subgrade prepared as recommended,we recommend the following pavement section options: <br /> Light Traffic and Parking: <br /> g <br /> • Two inches of hot mix asphalt pavement(HMA)over four inches of crushed surfacing rock <br /> • Full depth HMA—3 ''A inches <br /> Heavy Traffic: <br /> ' • Three inches of HMA over six inches of crushed surfacing rock <br /> • Full depth HMAC—5 inches <br /> 111 For exterior Portland cement concrete (PCC)pavement,we recommend the following: <br /> ' • 6 inches of PCC over two inches of aggregate base <br /> o 28 day compressive strength—4,000 psi <br /> o Control joints spaced at a maximum of 15 feet <br /> Soil cement stabilization or constructing a soil cement base for support of the pavement section can also be <br /> considered as an alternate to the above conventional pavement sections. Assuming a properly constructed soil <br /> cement base having a minimum thickness of 12 inches and a minimum 7-day compressive strength of 100 pounds <br /> ' per square inch (psi), a minimum HMA pavement thickness of 3 inches would be required for the heavy traffic <br /> areas. The design of the soil cement base should be completed using samples of the subgrade exposed at the time <br /> of construction. <br /> The paving materials used should conform to the Washington State Department of Transportation (WSDOT) <br /> specifications for HMA, PCC, and crushed surfacing. <br /> 6.0 ADDITIONAL SERVICES <br /> Terra Associates, Inc. should review project designs and specifications in order to verify that earthwork and <br /> foundation recommendations have been properly interpreted and incorporated into project design. We should also <br /> provide geotechnical services during construction to observe compliance with our design concepts, specifications, <br /> and recommendations. This will allow for expedient design changes if subsurface conditions differ from those <br /> anticipated prior to the start of construction. <br /> ' Page No. 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.