My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9526 7TH AVE SE 2025-09-16
>
Address Records
>
7TH AVE SE
>
9526
>
9526 7TH AVE SE 2025-09-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2025 9:01:58 AM
Creation date
8/11/2025 1:51:17 PM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
9526
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BTL 19011 Wood-Sno Road NE,Suite 100 <br /> Woodinville,WA 98072-4436 <br /> Phone:(425)814-8448 <br /> ENGINEERING Fax:(425)821-2120 <br /> SPECIAL INSPECTION <br /> Date: October 8,2024 <br /> To: Pacific Ridge Homes <br /> Attn: Sam Wiper <br /> From: Dane Pollett,P.E. <br /> Project: Chelsea Heights—Lot 7 Pages: 1 <br /> Thelon A- Garage Left <br /> BTL Engineering has performed Special Inspection as required by the City of Everett for shear walls with edge <br /> nailing at 4"on center or less for the above-mentioned project. The following Special Inspection Report includes a <br /> summary of our site visit. <br /> Construction Documents: <br /> ❑ Construction Set dated 05/12/2023 <br /> Progress of construction: <br /> ❑ Date of inspection:09/25/2024 <br /> ❑ Foundation completed <br /> ❑ Framing completed <br /> Items observed: <br /> 1 st Floor Walls: <br /> ❑ Rear/Sides:P1-6—No Inspection Required <br /> ❑ Front P1-2 Shear Walls <br /> o Edge Nailing and Sheathing Splices:Inadequate edge nailing was observed at P1-2 walls <br /> location. Contractorfxed in Feld and verified construction conforms to plan set. <br /> o Panel Seam Construction: Construction conforms to plan set. <br /> o Plate Nailing/Foundation Anchorage: Construction conforms to plan set <br /> tad Floor Walls: <br /> ❑ All Sides:P1-6-No Inspection required <br /> Give me a call if you have any questions or comments. <br /> �T.Lq <br /> Sincerely, <br /> Dane Pollett,P.E. <br /> BTL Engineering <br /> 35666 <br /> p� ISTB <br /> �ssI�NAL E�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.