Laserfiche WebLink
A Portion of Section 18,Township 28 North, Range 05 East,W.M. <br /> 1 PMP'S TO BE APPLIED AS APPROPRIATE 0.4 <br /> i BMP's: C101 Preserving Natural Vegetation W <br /> C105 Stabilized Construction Entrance r <br /> C120 Temporary&Permanent Seeding <br /> i i l i C121 Mulching O Z co <br /> C 123 Plastic Covering J 6�1 <br /> i I i i I i i C140 Dust Control O a Cq <br /> i I i C150 Materials on Hand Z o a s <br /> C151 Concrete Handling = Q 3 N <br /> C153 Material Delivery,Storage and Containment V a <br /> C160 Certified Erosion&Sediment Control Lead W o,o <br /> i i I i C220 Storm Drain Inlet Protection NM <br /> C233 Silt Fencing <br /> C234 Vegetated Strip <br /> i i I C235 Straw Wattles Z <br /> i --- - <br /> dc <br /> - ud <br /> Q <br /> 3 <br /> NOTE: <br /> C 151 -Concrete Washout Area designated inle-c-rrdmmt <br /> } o <br /> Lock&Load centralized location, 4 <br /> Wall Confirm location with Superintendent on site. a <br /> I°( j A 11 <br /> CITY OF EVERETT DESIGN AND CONSTRUCTION � <br /> STANDARDS VOLUME 1 SECTION 2-5 STANDARD NOTES <br /> 1! <br /> 1. Approval of this Erosion/Sedimentation Control(ESC)plan does not constitute an t <br /> Ex.Setvei I approval of permanent road or drainage design(e.g.,size and location of roads, a <br /> Manhole pipes,restrictors,channels,retention facilities,utilities), u <br /> i 2. The implementation of these esc plans and the construction,maintenance, x <br /> i I Temporary Amended replacement,and upgrading of these esc facilities is the responsibility of the o <br /> Soils Stockpile Area applicant/contractor until all construction is completed and approved and t u z ' o_ <br /> 1 SSCO vegetation/landscaping is established. o a� <br /> i ! /ESU.of 3. The boundaries of the clearing limits shown on this plan shall be clearly flagged in d u o o� <br /> the field prior to construction.During the construction period,no disturbance <br /> (� beyond the flagged clearing limits shall be permitted.The flagging shall be 3 <br /> - �' C C maintained by the applicant/contractor for the duration of construction. <br /> " ) 4. The ESC facilities shown on this plan shall be constructed in conjunction with all W <br /> �( ad clearing and grading activities and in such a manner as to ensure that sediment o <br /> r O and sediment laden water do not enter the drainage system,roadways,or violate to a <br /> - �� J� C 140 applicable water quality standards. a <br /> 5. The ESC facilities shown on this plan are the minimum requirements for anticipated 1�3 t t ` It C150 site conditions.During the construction period,these esc facilities shall be e <br /> upgraded as needed for unexpected storm events and to ensure that sediment = ZK <br /> i J\C and sediment-laden water do not leave the site. w <br /> c ,9 6. The ESC facilities shall be inspected routinely and maintained by the <br /> applicant/contractor to ensure their continued functioning,especially a 1 er storm v� a <br /> events. N tod <br /> ' e 7. The ESC facilities on inactive sites shall be inspected and maintained a minimum of o <br /> once a month or within the 48 hours following a major storm event. U <br /> 3I I Construct Stabilized Temporary 8. At no time shall more than one foot of sediment be allowed to accumulate within o <br /> i Construction Entrance per City of a trapped catch basin.All catch basins and conveyance lines shall be cleaned c <br /> hi prior to paving.The cleaning operation shall not flush sediment laden water into "S <br /> i Everett Std Dwg 201 the downstream system, a <br /> 9. Stabilized construction entrances shall be installed at the beginning of construction a LU <br /> C 105 and maintained for the duration of the project.Additional measures may be o t— <br /> i required to ensure that all paved areas are kept clean for the duration of the o O <br /> g t - project. � 3 <br /> 10.The contractor shall provide periodic street cleaning to remove debris and J <br /> sediment tracked off the site. O <br /> 11.Appropriate measures shall be taken to stop sediment from entering surface water o .J <br /> i I bodies if the proposed BMPs fail.If BMPs fail and sediment-laden water is leaving S <br /> s the site,immediately notify your public works inspector. <br /> i 12.Bare and/or disturbed soils shall remain uncovered and/or unstabilized for no more h <br /> than 2 days from October 1 through April 30 and for no more than 7 days from <br /> o i May 1 through September 30. <br /> 13.Notify the city public works inspector at least 24 hours prior to dewatering activities. z <br /> i Handle highly turbid or otherwise contaminated dewatering water separately from v <br /> stormwater. U <br /> 14.The approved project public works permit and SWPPP shall be retained on site or "= — <br /> u I I readily available to the contractor throughout the duration of the construction L <br /> 0 project. C co15.Design,install,implement,and maintain effective pollution prevention measures to N <br /> minimize the discharge of pollutants. <br /> 0 I 16.Protect all lid BMPs from sedimentation through installation and maintenance of <br /> v I erosion and sediment control BMPs on portions of the site that drain into the lid SHEET <br /> BMPs. <br /> C3 C4 <br /> 0 10' 11x17 <br /> LOT 10 TESC PLAN Scale: 1"=10' - <br /> N <br />