My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9554 7TH AVE SE 2025-09-16
>
Address Records
>
7TH AVE SE
>
9554
>
9554 7TH AVE SE 2025-09-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2025 10:28:40 AM
Creation date
8/12/2025 9:33:54 AM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
9554
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A Portion of Section 18,Township 28 North, Range 05 East,W.M. <br /> BMP'S TO BE APPLIED AS APPROPRIATE df <br /> o BMP's: C101 Preserving Natural Vegetation W <br /> C105 Stabilized Construction Entrance <br /> C120 Temporary&Permanent Seeding u; <br /> C121 Mulching O ,� <br /> Temporary Amended C123 Plastic Covering •• Z <br /> Moll! N <br /> Soils Stockpile Area C140 Dust Control p a cw <br /> C150 Materials on Hand Z y Q <br /> C151 Concrete Handling Z a 304 <br /> C 160 Certified Erosion osion&Sed meelivery,Storageant Control Lead nd nt W t-2)d <br /> C220 Storm Drain Inlet Protection o Cl) <br /> C233 Silt Fencing Q <br /> C234 Vegetated Strip 00 <br /> C235 Straw Wattles <br /> l Z <br /> a <br /> NOTE: <br /> C151 -Concrete Washout Area designated in o g � <br /> centralized location. 5� 6 <br /> Confirm location with Superintendent on site. ° <br /> e. < <br /> s � <br /> CITY OF EVERETT DESIGN AND CONSTRUCTION 6 <br /> STANDARDS VOLUME 1 SECTION 2-5 STANDARD NOTES <br /> 1. Approval of this Erosion/Sedimentation Control(ESC) plan does not constitute an <br /> approval of permanent road or drainage design (e.g.,size and location of roads, e <br /> pipes,restrictors,channels,retention facilities,utilities). u `v <br /> 2. The implementation of these esc plans and the construction,maintenance, Z <br /> replacement,and upgrading of these esc facilities is the responsibility of the o <br /> applicant/contractor until all construction is completed and approved and w m m o�Y Z <br /> vegetation/landscaping is established. U 3 6i <br /> ow <br /> 3. The boundaries of the clearing limits shown on this plan shall be clearly flogged in _0 Q� <br /> 99 duooQ� <br /> the field prior to construction.During the construction period,no disturbance <br /> beyond the flagged clearing limits shall be permitted.The flagging shall be <br /> maintained by the applicant/contractor for the duration of construction. 3 <br /> 4. The ESC facilities shown on this plan shall be constructed in conjunction with all W <br /> clearing and grading activities and in such a manner as to ensure that sediment o <br /> and sediment laden water do not enter the drainage system,roadways,or violate <br /> applicable water quality standards. a <br /> C 140 5. The ESC facilities shown on this plan are the minimum requirements for anticipated < r <br /> site conditions.During the construction period,these esc facilities shall be z <br /> I OC 150 upgraded as needed for unexpected storm events and to ensure that sediment <br /> and sediment-laden water do not leave the site. w <br /> a 6. The ESC facilities shall be inspected routinely and maintained by the w <br /> applicant/contractor to ensure their continued functioning,especially a 1 er storm ; <br /> events. = m <br /> 7. The ESC facilities on inactive sites shall be inspected and maintained a minimum of -r- ' o <br /> once a month or within the 48 hours following a major storm event. U - <br /> o Construct Stabilized Temporary 8. At no time shall more than one foot of sediment be allowed to accumulate within <br /> D _-- Construction Entrance per City of a trapped catch basin.All catch basins and conveyance lines shall be cleaned CL <br /> W ,;� r oJi- �o` _ Everett Std Dwg 201 prior to paving.The cleaning operation shall not flush sediment laden water into U <br /> O } <br /> n = ' _ �1 the downstream system. a <br /> J �u ��o�J- C10 9. Stabilized construction entrances shall be installed at the beginning of construction a W <br /> _ _ — _ _ _ _ y, l' �,t =7 `�a� and maintained for the duration of the project.Additional measures may be o I- <br /> 0 , - - — - - — - - — - - — _ required to ensure that all paved areas are kept clean for the duration of the a <br /> _ `� project. U a NO <br /> N �,� - ✓J; J 10.The contractor shall provide periodic street cleaning to remove debris and � } <br /> > 6 0 sediment tracked off the site. <br /> ° - = z r�a' ��•_ q� 1 1.Appropriate measures shall be taken to stop sediment from entering surface water m 0 <br /> bodies if the proposed BMPs fail.If BMPs fail and sediment-laden water is leaving o <br /> the site,immediate) notifyo <br /> 12.Bare and/or disturbed soihallrre remain uncovered and/or unstabilized for no more -2 <br /> than 2 days from October 1 through April 30 and for no more than 7 days from a > <br /> \ May 1 through September 30. g <br /> I�� Notify _� fy the city public works inspector at least 24 hours prior to dewatering activities. <br /> L Handle highly turbid or otherwise contaminated dewatering water separately from <br /> stormwater. U ; <br /> `o 14.The approved project public works permit and SWPPP shall be retained on site or `~ <br /> 0 readily available to the contractor throughout the duration of the construction U t <br /> Aisle D project. o <br /> CL on <br /> 15.Design,install,implement,and maintain effective pollution prevention measures to <br /> FN <br /> 0 minimize the discharge of pollutants. 01 <br /> 16.Protect all lid BMPs from sedimentation through installation and maintenance of <br /> erosion and sediment control BMPs on portions of the site that drain into the lid C3 SHE <br /> m� C4 <br /> U 0 10, <br /> BMPs. <br /> I1x17 <br /> LOT 16 TESC PLAN - -- -- - -- - Scale: 1"=10' - <br />
The URL can be used to link to this page
Your browser does not support the video tag.