My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/08/06 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/08/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 10:12:38 AM
Creation date
8/12/2025 10:09:53 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/6/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> City Council Agenda Item Cover Sheet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: Authorize the Mayor to sign Amendment #1 to the professional services agreement with HDR <br />Engineering, Inc. for the Lexington-Broadway Stormwater Improvements Phase 1 project. <br />Council Bill # <br /> Project: Lexington-Broadway Stormwater Improvements Phase 1 (aka <br />Lenora Regional Stormwater Facility) <br />Partner/Supplier: HDR <br /> Location: Lenora St. between S 3rd Avenue and BNSF RR <br />Preceding action: Lexington-Broadway Stormwater Improvements PSA – Approved 5-1-24 <br />Fund: 336 – Utilities Fund, Program 030 <br />Agenda dates requested: <br /> <br />Briefing <br />Proposed action <br />Consent 07/23/25 <br />Action <br />Ordinance <br />Public hearing <br /> Yes x No <br /> <br />Budget amendment: <br /> Yes x No <br /> <br />PowerPoint presentation: <br /> Yes x No <br /> <br />Attachments: <br />Amendment to Lexington- <br />Broadway Drainage <br />Improvements Phase 1 PSA <br /> <br />Department(s) involved: <br />Public Works <br /> <br />Contact person: <br />Tom Hood <br /> <br />Phone number: <br />425-257-8809 <br /> <br />Email: <br />THood@everettwa.gov <br />Initialed by: <br />RLS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />The amendment adds additional services to the original PSA in order to provide <br />consultant support for the bidding and construction phases of the project. Most of the <br />expenditures under the amendment will be eligible for reimbursement through a grant <br />from the Washington Department of Ecology. <br />Original PSA amount $877,460 <br />Amendment amount $399,610 <br />Total contract amount $1,277,070 <br /> <br />Project summary statement: <br />This project will construct a stormwater treatment facility in the Lowell neighborhood <br />and replace approximately three blocks of undersized stormwater pipe on Lenora St. <br />Once subsequent stormwater projects are completed the treatment facility will remove <br />pollutants from stormwater runoff generated by more than 250 acres of the city prior to <br />discharge to the Snohomish River. The project also includes interpretive pedestrian <br />facilities, landscaping and restoration of disturbed streets and property. <br />Amendment #1 to the HDR contract funds completion of design and consultant support <br />during bidding and construction phases. The previous contract was for partial design and <br />permitting only and did not include bidding and construction period support services. <br />The amendment also extends the expiration date of the agreement to allow for the <br />completion of the additional work. <br /> <br />Recommendation (exact action requested of Council): Authorize the Mayor to sign <br />Amendment #1 to the Professional Services Agreement with HDR Engineering, Inc. for <br />the Lexington-Broadway Stormwater Improvements Phase 1 project for the amount of <br />$399,610.
The URL can be used to link to this page
Your browser does not support the video tag.