My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/08/06 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/08/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 10:12:38 AM
Creation date
8/12/2025 10:09:53 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/6/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />13 <br /> <br /> <br />Task Number Description Estimated Fee <br />100 Project Management (bid and construction phases) $64,170 <br />200 Survey and Utility Location $5,690 <br />300 Geotechnical Engineering Services $45,850 <br />500 Project Reports $19,400 <br />700 Final Design Services $26,510 <br />800 Bid Phase Support $57,470 <br />900 Engineering Support during Construction $131,470 <br />1000 Permitting $0 <br />1100 Unanticipated Services (optional) $50,000 <br />Total not to exceed $399,610 <br />*Subconsultants and expenses will be billed at a 5% markup. <br />
The URL can be used to link to this page
Your browser does not support the video tag.