My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/08/06 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/08/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 10:12:38 AM
Creation date
8/12/2025 10:09:53 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/6/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SUBAWARD AGREEMENT BETWEEN SNOHOMISH COUNTY AND <br />CITY OF EVERETT FOR ROUTE AND COST BENEFIT ANALYSIS TO Page 14 of 17 <br />RELOCATE WATER TRANSMISSION LINE NO. 5 <br /> <br /> <br />SUMMARY OF TOTAL PROJECT COST <br />Object Class <br />Categories <br />Total <br />Request Descriptions <br />a. Personnel $67,021 <br />City staff time for project management, consultant <br />contract administration, project coordination, progress <br />reporting, and invoicing. <br />b. Fringe <br />Benefits $32,979 Fringe benefits associated with personnel costs, <br />typically 33% of direct labor cost. <br />c. Travel $0 <br />d. Equipment $0 <br />e. Supplies $0 <br />f. Contractual $400,000 <br />Engineering consultant(s) will be competitively <br />selected to conduct the route analysis study and <br />Benefit-Cost Analysis with City staff support. <br />g. <br />Construction $0 <br />h. Other $0 <br />i. Total Direct <br />Charges $500,000 <br />j. Indirect <br />Charges $0 <br />k. Grand Total $500,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.