My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3200 CEDAR ST 2ND FL BLDG 1 2025-09-10
>
Address Records
>
CEDAR ST
>
3200
>
BLDG 1
>
3200 CEDAR ST 2ND FL BLDG 1 2025-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 8:22:23 AM
Creation date
8/12/2025 2:15:19 PM
Metadata
Fields
Template:
Address Document
Street Name
CEDAR ST
Street Number
3200
Unit
2ND FL
Tenant Name
BLDG 1
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intake & Approval Sheet (FOR PERMIT STAFF ONLV) PERMIT# ✓O <br /> T <br /> BUILDING -ANNING <br /> Intake OK by: Date: Intake OK by; Assign To: Date: <br /> Intake Comments: Intake Comments: <br /> Zone <br /> Overlay/Agreement <br /> ❑ Route to Commercial Building Nonresidential Use <br /> ❑ Route to Residential Building Residential Use <br /> ❑ Make this a"W"Permit Proposed No.of Dwelling Units: <br /> Bldg/TI/Addn/Rem Size Total No. of Dwelling Units: <br /> Garage/Accessory Struct. Size Planning/Landscape Inspection Required before Final? ❑Yes ❑No <br /> Number of Stories "In Lieu"Fee:Type: Amount$ <br /> Basement ❑No ❑Yes , Fin/Unfin School Impact Fee: Total $ <br /> Type of Construction Calculated: Credit: <br /> Occupancy Group ❑Everett School Dist ❑Mukilteo School Dist <br /> Occupancy Load Park Impact Fees for permits applied for after 1/112022: <br /> Fire Sprinklers: El Update Existing ❑New System ❑Not'Req'd Park Impact Fee Total$ (net due after credit for existing uses) <br /> Reason Sprinklers Required: Fee Schedule Used For Calculation(Year): <br /> - <br /> ------------------------------------------------------------------ <br /> Fire Alarm: ❑Update Existing ❑New System ❑Not Req'd Permit Technician Use Only:Apply Phase-In Credit Per EMC19.63.200...........Reason Fire Alarm Required: ❑ 100%Credit-Issued 1/1/2022-9/2/2022 <br /> RCW 64.55 MF vyorksheet req'd for permit? ❑Yes ❑ No ❑ 50%Credit-Issued 9/3/2022-6/2/2023 <br /> Add']RCW 64.55 does required prior to final? ❑Yes ❑No ❑ 0%Credit-Issued 6/3/2023 or later <br /> VALUATION CALCULATION: Total$ Additional Notes: <br /> Approved By: Date: <br /> PUBLIC WORKS <br /> Additional Notes: Intake OK by: Date: <br /> ------------------------------------------ <br /> Intake Comments: ;PW Worksheet Needed if. <br /> .:[]Sys Dev Eva[(utli/sW)(]Traffic Mit Eval <br /> Approved By: Date: ❑Site Work/Drainage ElAddress Letter <br /> ❑Backflow Prevention for high hazard: <br /> (dental,medical,animals,mortuary,hospital, <br /> FIRE DEPARTMENT supportive housing) <br /> '-------- - ------ ----------- ---------- <br /> Separate I Deferred Submittals Required: ❑Route this folder for PW Review at end ---PW Review Worksheet <br /> ❑Fire Sprinklers ❑Fire Alarm ❑Other: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> This Permit is Approved by Public Works <br /> Fire Dept. Fees: See PW Review Worksheet and associated attached items <br /> ❑ Review of As-Built Plans-NO FIRE FEE ❑A Separate PW Permit is Required(Permit#: PW_ ) <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE AND ❑ Is located in this folder <br /> Review/Inspection Scope-ADD FIRE FEE ❑ Is in a Separate Green Folder Qoin with this folder for permit Issuance) <br /> Approved By: Date: ❑ Will be issued separately(separate Green Folder,PW Issued ahead of Bldg) <br /> ❑ Public Works has no scope---PW Not Required <br /> ELECTRICALMLUMBING Additional Notes:_F1IK Ktax-kt'4� 0fV'r"ov 3 (3 & <br /> Additional Notes: <br /> Approved By: Date: Completed By: Date: 7 ( <br />
The URL can be used to link to this page
Your browser does not support the video tag.