My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-58 2025-09-29
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-58
>
3003 W CASINO RD BLDG 40-58 2025-09-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 9:12:25 AM
Creation date
8/12/2025 3:19:33 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-58
Permit
2022
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
...� . <br /> E <br /> INSTAClATION INSTRUCTIONS rrrdx riusrrowersTowels <br /> i <br /> Power-Stud+ SD2 Anchor Detail Head Marking <br /> limh <br /> a 3 <br /> r Mandl _ ,.{,♦,. 1 <br /> '} Legend <br /> a boom Letter Code =Length Identification Mark <br /> a <br /> ha d. ho +'Symbol =Strength design Compliant Anchor <br /> Number Code 2=Carbon Steel body and Stainless Steel Expansion Clip <br /> Before After <br /> Length Identification <br /> Mark A !3 C b E F G N 1 J K L M N 0" P <br /> from 1-1/2 2" 2 1/2" 3" 3 1/2" 4' 4.1/2" 5" 5-1/2" 6" 6-1/2" 7" 7-1/2" 8" 8.1/2" 9" <br /> o Up to but not 2" 3" 3-1/2'. 4" 4-112" 5" 5-1/2" 6" 6-1/2" 7" 7-1/2" 8" 8-1/2" 9" 9.1/2" <br /> including <br /> Length Identification mark Indicates overall length of anchor. <br /> INSTALLATION INSTRUCTIONS <br /> Installation Inshvetions for Power-Stud+ 5D2 <br /> a _ . _ . _ r <br /> v.oA v te, v �a•ep'a17 o'Dp.+v'De. <br /> . r ® ' ?tiLtEL'i;___ ICE <br /> �'.rr'" -•- _ .rx �� <br /> n �/i ff# v 4==v p•: v•�p.:v'Db. <br /> v1 �- r_._... <br /> Step 1 Step 2 Step 3 Step 4 <br /> Using the proper drill tut size,drill a hole Remove dust and debris from the hole Position the washer on the anchor and Tighten the anchor With a torque wrench <br /> Into the base material to the required during drilling,(e.g.dust extractor, thread on the nut.If installing through by applying the required installation <br /> depth.The tolerances of the drill bit hollow bit)or following drilling(e.g. a fixture,drive the anchor through the torque,Tw. <br /> used should meet the requirements of suction,forced air)to extract base fixture into the hole. Be sure the anchor <br /> ANSI Standard 8212.15. particles created by drilling. Is driven to the minimum required <br /> ( embedment depth,twbc.. <br /> z_ <br /> u� <br /> P <br /> m <br /> m <br /> �i <br /> 0 <br /> 0 <br /> www.®EWALT..com <br />
The URL can be used to link to this page
Your browser does not support the video tag.