My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
200 W MARINE VIEW DR ON TRAC LOGISTICS Geotech Report 2025-08-12
>
Address Records
>
W MARINE VIEW DR
>
200
>
ON TRAC LOGISTICS
>
Geotech Report
>
200 W MARINE VIEW DR ON TRAC LOGISTICS Geotech Report 2025-08-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 3:53:07 PM
Creation date
8/12/2025 3:50:23 PM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
200
Tenant Name
ON TRAC LOGISTICS
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TERRA ASSOCIATES, Inc. <br /> Consultants in Geotechnical Engineering, Geology <br /> and <br /> Environmental Earth Sciences <br /> October 16,2020 <br /> Project No. T-8221 <br /> Mr. Dave Kessler <br /> Latitude Development <br /> P.O. Box 817 <br /> Auburn, Washington 98071-0817 <br /> Subject: Geotechnical Report <br /> Baywood Industrial <br /> West Marine View Drive <br /> Everett, Washington <br /> Dear Mr. Kessler: <br /> As requested, we have conducted a geotechnical engineering study for the subject project. The attached report <br /> presents our findings and recommendations for the geotechnical aspects of project design and construction. <br /> As indicated by current and previous site explorations, soil conditions at the site consist of 10 to 12 feet of sand fill <br /> overlying native alluvial soils. The alluvial soils consist of a thin layer of soft silt sediments underlain by a 40-to <br /> 55-foot-thick layer of medium dense to dense sand/silty sand. Compressible clayey silt and silty clay were indicated <br /> below the sands to the 80-foot termination depth of the cone penetration tests(CPTs). <br /> In our opinion,soil and groundwater conditions at the site will be suitable for support of the development as planned <br /> provided recommendations contained herein are incorporated into project design and construction specifications. <br /> We trust the information provided in the attached report is sufficient for your current needs. If you have any <br /> questions or need additional information,please call. <br /> Since 04.5 s ScA/ <br /> TE . O F• ;A,4 <br /> : L; `— 10-16-2020 <br /> T 0,,re J. , P. . Li-3 <br /> Pr ?.7-2 <br /> w <br /> SiO <br /> 12220 113th Avenue NE, Ste. 130, Kirkland, Washington 98034 <br /> Phone (425)821-7777 • Fax (425)821-4334 <br />
The URL can be used to link to this page
Your browser does not support the video tag.