My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9516 7TH AVE SE 2025-09-16
>
Address Records
>
7TH AVE SE
>
9516
>
9516 7TH AVE SE 2025-09-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2025 8:44:09 AM
Creation date
8/13/2025 9:54:11 AM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
9516
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
< A Portion of Section 18,Township 28 North, Range 05 East,W.M. <br /> N f BM 'S TO BE APPLIED AS APPROPRIATE ' <br /> I qq I I ; MP's: C10I Preserving Noturol Vegetation �k <br /> C105 Stabilized Construction Entrance <br /> C120 Temporary&Permanent Seeding <br /> C121 Mulching z"r <br /> C123 Plastic Covering <br /> C140 Dust Control a <br /> C 150 Materials on Hand m a <br /> C 151 Concrete Handling ¢ LO <br /> C153 Material Delivery,Storage and Containment C s o 10 <br /> C160 Certified Erosion&Sediment Control Lead 0)10 <br /> i C220 Storm Drain Inlet Protection o <br /> C233 5111 Fencing ¢ <br /> Construct Stabilized Temporary C234 Vegetated Strip <br /> Construction Entrance per City of E , I C235 Straw Wattles <br /> Everett Sid Dwg 201 <br /> I NOTE: � i_ 7- <br /> C151 -Concrete Washout Area designated in o '�� o <br /> 1 centralized location: <br /> Confirm location with Superintendent on site. <br /> I E CITY OF EVERETT DESIGN AND CONSTRUCTION <br /> STANDARDS VOLUME 1 SECTION 2-5 STANDARD NOTES <br /> i I 1. Approval of this Erosion/Sedimentation Control(ESC) plan does not constitute an <br /> i i I approval of permanent road or drainage design{e.g.,size and location of roads, a <br /> pipes,restrictors,channels,retention facilities,utilities). <br /> CCIQ <br /> 2. the implementation of these esc plans and the construction,maintenance. <br /> replacement,and upgrading of these esc facilities is the responsibility of the m; , z <br /> C 15 applicant/contractor until all construction is completed and approved and 3 _��cz o <br /> vegetation/landscaping is established. o <br /> 3. The boundaries of the clearing limits shown on this plan shall be clearly flagged in a o o <br /> I the field prior to construction.During the construction period,no disturbance <br /> 45 <br /> ,• � I beyond the flagged clearing limits shall be permitted.The flagging shall be <br /> maintained by the applicant/contractor for the duration of construction. _ <br />�, i...._..._—_._........._._._. 5 4. The ESC facilities shown on this Ian shall be constructed in con'unction with all <br /> p 1 W <br /> clearing and grading aciivittes and in such a manner as to ensure that sediment o <br /> Temporary Amended i <br /> � and sediment laden water do not enter the drainage system,roadways,or violate in <br /> SK-0. i <br /> i Soils Stockpile Area s applicable water quality standards. C 12 <br /> a <br /> 5. The ESC facilities shown on this plan are the minimum requirements for anticipated 3 z <br /> i site conditions.During the construction period,these esc facilities shall be t <br /> I! !! <br /> upgraded as needed for unexpected storm events and to ensure that sediment = N <br /> and sediment-laden water do not leave the site. <br /> e <br /> 6. The ESC facilities shall be inspected routinely and maintained by the �y <br /> F applicant/contractor to ensure their continued functioning,especially al er storm Q <br /> events. m <br /> ! 7. The ESC facilities on inactive sties shall be inspected and maintained a minimum of o <br /> once a month or within the 48 hours following a major storm event. U a O <br /> 8. At no time shall more than one foot of sediment be allowed to accumulate within N <br /> a irapped catch basin.All catch basins and conveyance lines shall be cleaned <br /> prior to paving.The cleaning operation shall not flush sediment laden water into o U <br /> ' the downstream system. cL <br /> h <br /> � � I 9. Stabilized construction entrances shall be installed at the beginning of construction ` LLJ <br /> and maintained for the duration of the project.Additional measures may be <br /> co <br /> p required to ensure that all paved areas are kept clean for the duration of the a LO <br /> 16 <br /> proje <br /> ct. <br /> ,.•. - ..,.,- 1 .Th contractor shall provide periodic street cleaning to remove debris and _ 3 <br /> :; ;:-.....:: - .... :,..._. a <br /> .. .._ , -..-. sediment tracked off the site. _ <br /> Aisle A ;' + 11,Approprioie measures shall be taken to stop sediment from entering surface water m <br /> bodies if the proposed BMPs fail.If BMPs fail and sediment-laden water is leaving o <br /> the site,Immediately notify our public works inspector.;;... .. ... 4r +,, .. .._ .. ;..... _. .. v; 1. Y Y Y p p , <br /> v; ;; ,;, - -- ... +•;..._. .. ,.,....._. ..., 1 I_;. . ..., 12.Bare land/or disturbed soils shall remain uncovered and/or unstabilized for no more <br /> than 2 days from October 1 through April 30 and for no more than 7 days from (U <br /> LL a l through September 0.r � <br /> ih e e 3 <br /> r _... ...._................._._.......__.__ ..._ _._._...__...._._... ......... ` _....._... _.._......... 13.Notify the city public works inspector at least 24 hours prior to dewaiering activities. <br /> r _.... ......._ _ _._..... ............... . ... ........ . ....._. ..._.._.... .... _........._...._._.._._........_..... .. _...._.. . <br /> Handle highly turbid or otherwise contaminated dewaiering water separately from <br /> _ .. <br /> s stormwaier. U <br /> 14.The approved project public works permit and SWPPP shall be retained on site or — — <br /> readily available to the contractor throughout the duration of the construction_Q project. o <br /> 15.Design,install,implement,and maintain effective pollution prevention measures to a <br /> minimize the discharge of pollutants. <br /> a 16.Protect all lid BMPs from sedimentation through installation and maintenance of See <br /> t v erosion and sediment control BMPs on portions of the site that drain into the lid C3 m C <br /> i _ _... ...._.............._....... -- BMPs <br /> _..... <br /> r_ 1 <br /> LOT 45 TESC PLAN Scale: 1"=10' - <br /> N <br />
The URL can be used to link to this page
Your browser does not support the video tag.