My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9584 7TH AVE SE 2025-09-16
>
Address Records
>
7TH AVE SE
>
9584
>
9584 7TH AVE SE 2025-09-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2025 11:22:50 AM
Creation date
8/13/2025 10:34:47 AM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
9584
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A Portion of Section 18,Township 28 North, Range 05 East,W.M. <br /> - - - - -- _ BNIP'S TO BE APPLIED AS APPROPRIATE <br /> N BMP's: C101 Preserving Natural Vegetation W <br /> R C105 Stabilized Construction Entrance <br /> C120 Temporary&Permanent Seeding ,,; <br /> - SS--- i5--- - C 121 Mulching Z co <br /> Aisle A C123 Plastic Covering J 6 <br /> C140 Dust Control D a N <br /> C150 Materials on Hand Z <br /> a)3 N <br /> C151 Concrete Handling = a ,C <br /> C153 Material Delivery,Storage and Containment (� U) <br /> C160 Certified Erosion&Sediment Control Lead .2 <br /> C220 Storm Drain Inlet Protection o mM <br /> - — <br /> - C233 SiltFencing oo a <br /> - n C235 Straw Wattttlesrip 0 <br /> _ <br /> ` Ex.A4ele/ OW_ �_Zo UoJ I NOTE: I/ <br /> I C151 -Concrete Washout Area designated in J <br /> centralized location. <br /> Confirm location with Superintendent on site. <br /> u <br /> _ SSCO v Construct Stabilized Temporary CITY OF EVERETT DESIGN AND CONSTRUCTION <br /> 1E514.7# - Construction Entrance per City <br /> of Everett Std Dwg 201 STANDARDS VOLUME 1 SECTION 2-5 STANDARD NOTES <br /> C 10 1. Approval of this Erosion/Sedimentation Control(ESC)plan does not constitute an <br /> approval of permanent road or drainage design(e.g.,size and location of roads, <br /> pipes,restrictors,channels,retention facilities,utilities). `u <br /> 2. The implementation of these esc plans and the construction,maintenance, <br /> replacement,and upgrading of these esc facilities is the responsibility of the m>_ z <br /> applicant/contractor until all construction is completed and approved and u z o <br /> vegetation/landscaping is established, o <br /> 3. The boundaries of the clearing limits shown on this plan shall be clearly flagged in d o o <br /> the field prior to construction.During the construction period,no disturbance <br /> beyond the flagged clearing limits shall be permitted.The flagging shall be <br /> maintained by the applicant/contractor for the duration of construction. 3 <br /> 4. The ESC facilities shown on this plan shall be constructed in conjunction with all w <br /> clearing and grading activities and in such a manner as to ensure that sediment o <br /> and sediment laden water do not enter the drainage system,roadways,or violate +^ N <br /> applicable water quality standards. a <br /> C14 5. The ESC facilities shown on this plan are the minimum requirements for anticipated 3 i <br /> site conditions.During the construction period,these esc facilities shall be z <br /> C 150 upgraded as needed for unexpected storm events and to ensure that sediment = v <br /> and sediment-laden water do not leave the site. W <br /> 28 6. The ESC facilities shall be inspected routinely and maintained by the <br /> applicant/contractor to ensure their continued functioning,especially aler storm �n > <br /> events. N t m <br /> 7. The ESC facilities on inactive sites shall be inspected and maintained a minimum of S C <br /> once a month or within the 48 hours following a major storm event. - Q <br /> g 8. At no time shall more than one foot of sediment be allowed to accumulate within L' CL <br /> { a trapped catch basin.All catch basins and conveyance lines shall be cleaned <br /> prior to paving.The cleaning operation shall not flush sediment laden water into -e U <br /> the downstream system. a <br /> 9. Stabilized construction entrances shall be installed at the beginning of construction ` Lt J <br /> and maintained for the duration of the project.Additional measures may be <br /> co required to ensure that all paved areas are kept clean for the duration of the a <br /> o project. a <br /> 00 <br /> 10.The contractor shall provide periodic street cleaning to remove debris and J 3 cV <br /> sediment tracked off the site. L O <br /> g 11.Appropriate measures shall be taken to stop sediment from entering surface water W m ,J <br /> a bodies if the proposed BMPs fail.If BMPs fail and sediment-laden water is leaving C o <br /> the site,immediately notify your public works inspector. <br /> 12.Bare and/or disturbed soils shall remain uncovered and/or unstabilized for no more y <br /> than 2 days from October 1 through April 30 and for no more than 7 days from <br /> May 1 through September 30. 7 <br /> 13.Notify the city public works inspector of least 24 hours prior to dewatering activities. <br /> u Handle highly turbid or otherwise contaminated dewatering water separately from v <br /> = stormwater. U a, <br /> 0 14.The approved project public works permit and SWPPP shall be retained on site or 4- <br /> E readily available to the contractor throughout the duration of the construction U = <br /> project. CL m <br /> Temporary Amended 15.Design,install,implement,and maintain effective pollution prevention measures to <br /> Soils Stockpile Area minimize the discharge of pollutants. <br /> 16.Protect all lid BMPs from sedimentation through installation and maintenance of <br /> oerosion and sediment control BMPs on portions of the site that drain into the lid C3 s a�� C4 <br /> � 0 10' BMPs. <br /> U <br /> 11x17 <br /> U <br /> LOT 28 TESC PLAN Scale: 1"=10' <br />
The URL can be used to link to this page
Your browser does not support the video tag.