My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9584 7TH AVE SE 2025-09-16
>
Address Records
>
7TH AVE SE
>
9584
>
9584 7TH AVE SE 2025-09-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2025 11:22:50 AM
Creation date
8/13/2025 10:34:47 AM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
9584
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A Portion of Section 18,Township 28 North,Range 05 East,W.M. <br /> — - - — - - -_ BMP'S TO BE APPLIED AS APPROPRIATE <br /> BMP's: C101 Preserving Natural Vegetation W <br /> C 105 Stabilized Construction Entrance <br /> C 120 Temporary&Permanent Seeding LL; ' <br /> C121 Mulching O z M <br /> Aisle A C123 Plastic Covering J F1 <br /> 00 <br /> C 140 Dust Control O D 0 N <br /> C150 Materials on Hand Z 4)3 N <br /> C151 Concrete Handling = ¢ LO <br /> C153 Material Delivery,Storage and Containment V o d <br /> C160 Certified Erosion&Sediment Control Lead <br /> C220 Storm Drain Inlet Protection <br /> -- -— - - — - Zi_ — _ _ _ _ _ C233 Silt Fencing a <br /> C234 Vegetated Strip <br /> 5 C235 Straw Wattles = <br /> --- SO--- v,--- <br /> c J <br /> Ex.Melee o o of } <br /> NOTE: IfS2 <br /> C 151 -Concrete Washout Area designated in <br /> centralized location. s <br /> Confirm location with Superintendent on site. LLE <br /> SSC0 Construct Stabilized Temporary CITY OF EVERETT DESIGN AND CONSTRUCTION <br /> %E51�4.7+ Construction Entrance per City <br /> of Everett Std Dwg 201 STANDARDS VOLUME 1 SECTION 2-5 STANDARD NOTES <br /> C 10 1. Approval of this Erosion/Sedimentation Control(ESC)plan does not constitute an <br /> approval of permanent road or drainage design(e.g.,size and location of roads, Q <br /> pipes,restrictors,channels,retention facilities,utilities). `o <br /> 2. The implementation of these esc plans and the construction,maintenance, <br /> replacement,and upgrading of these esc facilities is the responsibility of the o m <br /> applicant/contractor until all construction is completed and approved and u z ' o <br /> vegetation/landscaping is established. o a d <br /> 3. The boundaries of the clearing limits shown on this plan shall be clearly flagged in duo o <br /> the field prior to construction.During the construction period,no disturbance <br /> beyond the flagged clearing limits shall be permitted.The flagging shall be <br /> maintained by the applicant/contractor for the duration of construction. 3 <br /> 4. The ESC facilities shown on this plan shall be constructed in conjunction with all w <br /> clearing and grading activities and in such a manner as to ensure that sediment o <br /> and sediment laden water do not enter the drainage system,roadways,or violate cn <br /> applicable water quality standards. a <br /> 5. The ESC facilities shown on this plan are the minimum requirements for anticipated 3` t <br /> C140 site conditions.During the construction period,these esc facilities shall be 0 <br /> C 150 upgraded as needed for unexpected storm events and to ensure that sediment = ZR <br /> and sediment-laden water do not leave the site. a w <br /> 28 6. The ESC facilities shall be inspected routinely and maintained by the <br /> applicant/contractor to ensure their continued functioning,especially at er storm > F <br /> events. N L <br /> 7. The ESC facilities on inactive sites shall be inspected and maintained a minimum of L C <br /> once a month or within the 48 hours following a major storm event. U iD <br /> 8. At no time shall more than one foot of sediment be allowed to accumulate within N <br /> a trapped catch basin.All catch basins and conveyance lines shall be cleaned <br /> prior to paving.The cleaning operation shall not flush sediment laden water into -e U <br /> the downstream system. a <br /> 9. Stabilized construction entrances shall be installed at the beginning of construction ` Uj <br /> U and maintained for the duration of the project.Additional measures may be t— <br /> co <br /> required to ensure that all paved areas are kept clean for the duration of the a 00 <br /> o project. a <br /> 10.The contractor shall provide periodic street cleaning to remove debris and _ 3 } <br /> sediment tracked off the site. w O <br /> 11.Appropriate measures shall be taken to stop sediment from entering surface water = m J <br /> o bodies if the proposed BMPs fail.If BMPs fail and sediment-laden water is leaving s <br /> s the site,immediately notify your public works inspector. <br /> 12.Bare and/or disturbed soils shall remain uncovered and/or unstabilized for no more N <br /> than 2 days from October 1 through April 30 and for no more than 7 days from <br /> o May 1 through September 30. <br /> 13.Notify the city public works inspector at least 24 hours prior to dewatering activities. <br /> Handle highly turbid or otherwise contaminated dewatering water separately from <br /> L stormwater. U <br /> 14.The approved project public works permit and SWPPP shall be retained on site or "= - <br /> E readily available to the contractor throughout the duration of the construction a o <br /> Temporary Amended project. tL m <br /> p ry 15.Design,install,implement,and maintain effective pollution prevention measures to N <br /> Soils Stockpile Area minimize the discharge of pollutants. rol <br /> _ 16.Protect all lid BMPs from sedimentation through installation and maintenance of SHEET <br /> erosion and sediment control BMPs on portions of the site that drain into the lid C3 0, C4 <br /> 0 10'.9 0 BMPs. <br /> nx17 <br /> 'u <br /> LOT 28 TESC PLAN Scale: 1"=10' - <br />
The URL can be used to link to this page
Your browser does not support the video tag.