Laserfiche WebLink
- - ------ <br />Construct Stabilized Tempprary <br />Construction Entrance per City of <br />Everett Std Dw9 201 <br />LOT 41 TESC PLA <br />A Portion of Section 18, Township 28 North, Range 05 East, W.M. <br />i <br />I �y <br />Aisle D <br />--—--—--—--—-r <br />--- <br />i <br />j <br />c 1 Ex. Arfelt I <br />c SSCO 3 <br />)cam V 1ES137+ <br />' � I <br />I <br />. ' 3 <br />i I <br />� � I <br />0 10, <br />Scale: l "=10' <br />BMP'S TO BE APPLIED AS APPROPRIATE N <br />BMP's: C101 Preserving Natural Vegetation W <br />C105 Stabilized Construction Entrance <br />C120 Temporary & Permanent Seeding ,,; <br />C 121 Mulching �= Z an <br />C123 Plastic Covering `c1 <br />C 140 Dust Control O OD 0, N <br />C 150 Materials on Hand Z m a P <br />C151 Concrete Handling = a 3 <br />LO <br />C153 Material Delivery, Storage and Containment V a o d <br />C160 Certified Erosion & Sediment Control Lead <br />C220 Storm Drain Inlet Protection N .r <br />C233 Silt Fencing a <br />C234 Vegetated Strip O <br />C235 Straw Wattles <br />Z <br />a <br />a.! <br />NOTE: <br />C151 - Concrete Washout Area designated in <br />centralized location. ;: lr: o <br />Confirm location with Superintendent on site. <br />CITY OF EVERETT DESIGN AND CONSTRUCTION <br />STANDARDS VOLUME 1 SECTION 2-5 STANDARD NOTES <br />1. Approval of this Erosion/Sedimentation Control (ESC) plan does not constitute an t <br />approval of permanent road or drainage design (e.g., size and location of roads, <br />pipes, restrictors, channels, retention facilities, utilities). <br />2. The implementation of these esc plans and the construction, maintenance, <br />replacement, and upgrading of these esc facilities is the responsibility of the m m z <br />applicant/contractor until all construction is completed and approved and <br />vegetation/landscaping is established. 3 t J <br />3. The boundaries of the clearing limits shown on this plan shall be clearly flagged in = o o oe <br />the field prior to construction. During the construction period, no disturbance <br />beyond the flagged clearing limits shall be permitted. The flagging shall be <br />maintained by the applicant/contractor for the duration of construction. 3 <br />4. The ESC facilities shown on this plan shall be constructed in conjunction with all <br />UJ <br />clearing and grading activities and in such a manner as to ensure that sediment o <br />and sediment laden water do not enter the drainage system, roadways, or violate v) <br />applicable water quality standards. t" <br />5. The ESC facilities shown on this plan are the minimum requirements for anticipated >� <br />site conditions. During the construction period, these esc facilities shall be z <br />upgraded as needed for unexpected storm events and to ensure that sediment = m <br />and sediment -laden water do not leave the site. th a <br />6. The ESC facilities shall be inspected routinely and maintained by the <br />applicant/contractor to ensure their continued functioning, especially al er storm v> <br />events. j- ; <br />7. The ESC facilities on inactive sites shall be inspected and maintained a minimum of <br />once a month or within the 48 hours following a major storm event. U <br />8. At no time shall more than one foot of sediment be allowed to accumulate within <br />a trapped catch basin. All catch basins and conveyance lines shall be cleaned ° <br />prior to paving. The cleaning operation shall not flush sediment laden water into 8o <br />(� <br />the downstream system. a <br />9. Stabilized construction entrances shall be installed at the beginning of construction a LL] <br />and maintained for the duration of the project. Additional measures may be o F_ <br />required to ensure that all paved areas are kept clean for the duration of the 0, <br />project. J 3 <br />10. The contractor shall provide periodic street cleaning to remove debris and _ } <br />sediment tracked off the site. a, <br />11. Appropriate measures shall be taken to stop sediment from entering surface water = m J <br />bodies if the proposed BMPs fail. If BMPs fail and sediment -laden water is leaving o <br />the site, immediately notify your public works inspector. 2 <br />12. Bare and/or disturbed soils shall remain uncovered and/or unstabilized for no more H <br />than 2 days from October 1 through April 30 and for no more than 7 days from <br />May 1 through September 30. � <br />13. Notify the city public works inspector at least 24 hours prior to dewatering activities. <br />Handle highly turbid or otherwise contaminated dewatering water separately from <br />stormwater. U <br />14. The approved project public works permit and SWPPP shall be retained on site or '= - <br />readily available to the contractor throughout the duration of the construction 0 <br />project. 0CL <br />m <br />15.Design, install, implement, and maintain effective pollution prevention measures to N <br />minimize the discharge of pollutants. <br />\ 16.Protect all lid BMPs from sedimentation through installation and maintenance of SHEET <br />erosion and sediment control BMPs on portions of the site that drain into the lid C3 ofC4 <br />BMPs. <br />