My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3702 W MUKILTEO BLVD Geotech Report 2025-08-13
>
Address Records
>
W MUKILTEO BLVD
>
3702
>
Geotech Report
>
3702 W MUKILTEO BLVD Geotech Report 2025-08-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 1:43:45 PM
Creation date
8/13/2025 1:43:33 PM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
3702
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Eviuetion <br /> Mukilteo Boulevard Development <br /> Everett,Washington <br /> March 31,2003 <br /> NGA File No. 366503 <br /> Page 2 <br /> SCOPE <br /> The purpose of this study is to explore and characterize the subsurface soil and ground water conditions <br /> within this site and present preliminary recommendations for site development. Specifically,our scope of <br /> services includes the following: <br /> 1. Review available geologic and soils maps of the area. <br /> 2. Explore the site subsurface soil and ground water conditions with backhoe-excavated test <br /> pits. The backhoe subcontracted by NGA. <br /> 3. Provide recommendations for site grading and earthwork,including structural fill. <br /> 4. Evaluate the potential for use of the on-site soils for structural fill. <br /> 5. Provide recommendations for foundation support and slabs-on-grade. <br /> 6. Provide recommendations for lateral soil pressures on retaining walls. <br /> 7. Provide recommendations for site drainage and erosion control. <br /> 8. Document our findings, recommendations, and conclusions in a written geotechnical <br /> report. <br /> SITE CONDITIONS <br /> Surface Conditions <br /> The project site is an approximately 2 acre, irregular-shaped parcel. The site layout:is shown on the Site <br /> Plan in Figure 2. The site measures approximately 500 feet in the east-west direction and 240 feet in the <br /> north-south direction. The property is bordered to the north by Mukilteo Boulevard and to the east,south, <br /> and west by residential lots. <br /> Three single-family residences are currently located on the site, and a commercial building is located at <br /> the northwest corner of the site. A residence was previously located near the southwest corner of the site, <br /> that we understand has recently been demolished. A gazebo and a greenhouse are located south of the <br /> central portion of the site. A detached garage is.located south of the eastern residence. Several fences are <br /> located within the site and along the site boundaries. A small rockery is located west of the central <br /> residence, and a concrete retaining wall approximately 5 feet high is located north of this residence. The <br /> NELSON GEOTECHNICAL ASSOCIATES INC. <br /> EXHIBIT # (". <br /> PAGEF 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.