My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Washington State Recreation and Conservation Office 8/6/2025
>
Contracts
>
Agreement
>
Grant Agreement (City as Grantee)
>
Washington State Recreation and Conservation Office 8/6/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 3:51:14 PM
Creation date
8/13/2025 3:50:39 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington State Recreation and Conservation Office
Approval Date
8/6/2025
Council Approval Date
4/10/2024
End Date
12/31/2027
Department
Parks & Community Services
Department Project Manager
Katherine Phillips
Subject / Project Title
Edgewater Park Renovation Phase 2
Tracking Number
0004935
Total Compensation
$500,000.00
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
RCO: 24-1328 Revision Date: 1/31/2025 Page 9 of 22 <br />STANDARD TERMS AND CONDITIONS EFFECTIVE DATE <br />This document sets forth the Standard Terms and Conditions of the Recreation and Conservation Office as of 07/08/2025. <br />CITATIONS, HEADINGS AND DEFINITIONS <br />A. Any citations referencing specific documents refer to the current version on the effective date of this Agreement or the <br />effective date of any amendment thereto. <br />B. Headings used in this Agreement are for reference purposes only and shall not be considered a substantive part of <br />this Agreement. <br />C. Definitions. As used throughout this Agreement, the following terms shall have the meaning set forth below: <br />Agreement, terms of the Agreement, or project agreement – The document entitled “RCO GRANT AGREEMENT” <br />accepted by all parties to the present project and transaction, including without limitation the Standard Terms and <br />Conditions of the RCO Grant Agreement, all exhibits, attachments, addendums, amendments, and applicable <br />manuals, and any intergovernmental agreements, and/or other documents that are incorporated into the Agreement <br />subject to any limitations on their effect under this Agreement. <br />applicable manual(s), manual – A manual designated in this Agreement to apply as terms of this Agreement, <br />subject (if applicable) to substitution of the “RCO director” for the term “board” in those manuals where the project is <br />not approved by or funded by the referenced board, or a predecessor to the board. <br />applicable WAC(s) – Designated chapters or provisions of the Washington Administrative Code that apply by their <br />terms to the type of grant in question or are deemed under this Agreement to apply as terms of the Agreement, <br />subject to substitution of the “RCO director” for the term “board” or “agency” in those cases where the RCO has <br />contracted to or been delegated to administer the grant program in question. <br />applicant – Any party, prior to becoming a Sponsor, who meets the qualifying standards/eligibility requirements for <br />the grant application or request for funds in question. <br />application – The documents and other materials that an applicant submits to the RCO to support the applicant’s <br />request for grant funds; this includes materials required for the “Application” in the RCO’s automated project <br />information system, and other documents as noted on the application checklist including but not limited to legal <br />opinions, maps, plans, evaluation presentations and scripts. <br />Authorized Representative/Agent – A Sponsor’s agent (employee, political appointee, elected person, etc.) <br />authorized to be the signatory of this Agreement and any amendments requiring a Sponsor’s signature. This person <br />has the signature authority to bind the Sponsor to this Agreement, grant, and project. <br />C.F.R. – Code of Federal Regulations <br />completed project or project completion – The status of a project when all of the following have occurred: <br />The grant funded project has been inspected by the RCO and the RCO has determined that all scopes of <br />work to implement the project have been completed satisfactorily. <br />A final project report is submitted to and accepted by RCO. <br />Any needed amendments to the Agreement have been entered by the Sponsor and RCO and have been <br />delivered to the RCO. <br />A final reimbursement request has been delivered to and paid by RCO. <br />Documents affecting property rights (including RCO’s as may apply) and any applicable notice of grant, have <br />been recorded (as may apply). <br />contractor – An entity that receives a contract from a Sponsor related to performance of work or another obligation <br />under this Agreement. <br />conversion – A conversion occurs 1) when facilities acquired, developed, renovated or restored within the project <br />area are changed to a use other than that for which funds were approved, without obtaining prior written formal RCO <br />or board approval, 2) when property interests are conveyed to a third party not otherwise eligible to receive grants in <br />the program from which funding was approved without obtaining prior written formal RCO or board approval, or 3) <br />when obligations to operate and maintain the funded property are not complied with after reasonable opportunity to <br />cure.
The URL can be used to link to this page
Your browser does not support the video tag.