My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
701 COLBY AVE 2025-09-10
>
Address Records
>
COLBY AVE
>
701
>
701 COLBY AVE 2025-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:04:16 AM
Creation date
8/15/2025 9:40:43 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
701
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2312-041 Description: REMODEL,TI BEDROOM, BATHROOM, KITCHEN, HALLWAY <br /> (W2312-003) <br /> Applied: 12/16/2023 Approved: 2/21/2024 Site Address: 701 COLBY AVE <br /> Issued: 2/22/2024 Finaled: City,State Zip Code: EVERETT,WA 98201-1313 <br /> Status: PERMIT ISSUED-PAPER Applicant:SAWYER HAWK <br /> Parent Permit:W2312-003 Owner: CRANE TIMOTHY R <br /> Parent Project: Contractor: HAWK BROTHERS CONSTRUCTION LLC <br /> Details: <br /> 1/31/2024,SCOPE OF WORK INCREASED DEMO/REFRAME BEDROOM, BATHROOM,AND HALLWAY WALLS. EXPANSION OF DOORWAY <br /> BETWEEN KITCHEN&LIVING ROOM. FULL KITCHEN REMODEL, MINOR LAUNDRY ROOM, BATHROOM REMODEL. REFLOOR ENTIRE <br /> HOUSE, RELOCATION OF SHWOER/TOILET&REPLUMBING IN MASTER BATHROOM. <br /> MMI OM <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 3/19/2024 3/19/2024 BLDG 08-FRAMING RAKEEB KHAN APPROVAL As noted <br /> Notes: <br /> TRAVIS 281-798-2664 <br /> travis@hawkbrothersconstruction.com <br /> Rescheduled from 3/21 to 3/19.Contractor adding fireblocking at top of furred walls in kitchen and bathroom.OK to drywall mud and tape. <br /> 4/12/2024 4/12/2024 BLDG 15-OTHER RAKEEB KHAN OTHER MUD PAN TEST <br /> Notes: <br /> 206-295-6066 <br /> VAUGHNBARKHURST@ICLOUD.COM <br /> Rescheduled under plumbing permit. <br /> 6/21/2024 6/21/2024 BLDG 16-FINAL RAKEEB KHAN CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 6/20/2024 4:35 PM HAWK BROTHERS CONSTRUCTION LLC <br /> Contact Name:HAWK BROTHERS CONSTRUCTION LLC <br /> Site Address:701 COLBY AVE <br /> Phone:4255300318 <br /> e-Mail:travis@hawkbrothersconstruction.com <br /> Need all sub permit final approval prior to building final. <br /> 6/26/2024 6/26/2024 BLDG 16-FINAL RAKEEB KHAN APPRVD-PERMIT <br /> FINAL <br /> Notes: <br /> 6/27/2024 CERTIFICATE OF Permit Technician <br /> OCCUPANCY <br /> Notes: <br /> I_ <br /> Printed:Thursday, 27 June, 2024 1 of 1 F� <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.