Laserfiche WebLink
f <br /> €u <br /> h <br /> Figure 11: EVSE Location on Final Wall <br /> Load Shed <br /> This project will utilize a Stepwise Tap [https://www.getstepwise.com/] dynamic load management <br /> solution. This device of capable of acting as a load shed, as well as communicating with the EVSE <br /> directly to adjust maximum current based on household load. <br /> EVSE <br /> This project will utilize a Grizzle-E Ultimate 48A hard-wired EVSE. The EVSE has an adjustable <br /> maximum load, which will be set to 40A to accommodate the 50A circuit(80% rule). <br /> https:Hgrizzl-e.com/products-specs/grizzl-e-ultimate-48/ <br /> 8 <br />