My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4910 W VIEW DR 2025-09-09
>
Address Records
>
W VIEW DR
>
4910
>
4910 W VIEW DR 2025-09-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2025 2:17:11 PM
Creation date
8/16/2025 2:17:11 PM
Metadata
Fields
Template:
Address Document
Street Name
W VIEW DR
Street Number
4910
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2504-130 Description: 200AMP PANEL SWAP+NEW LIGHTING CIRCUIT <br /> Applied:4/17/2025 Approved:4/18/2025 Site Address:4910 W VIEW DR <br /> Issued:4/23/2025 Finaled: 6/20/2025 City,State Zip Code: EVERETT,WA 98203 <br /> Status: FINALED Applicant:CM AIR PROS LLC(ELEC) <br /> Parent Permit: Owner: BLACK KEITH&PAULA K <br /> Parent Project: Contractor: CM AIR PROS LLC(ELEC) <br /> Details: <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 6/4/2025 6/4/2025 ELEC 06-ROUGH IN MICHAEL PARTIAL eTRAKiT Inspection Request <br /> WICKLANDER APPROVAL <br /> Notes: <br /> 5/29/2025 2:46 PM CM AIR PROS LLC(ELEC) <br /> PM RQTSD <br /> Contact Name:SABRINA KENNARD(PERMIT COORD) <br /> Site Address:4910 W VIEW DR <br /> Phone:4258356474 <br /> e-Mail:kstaggs@cmheating.com <br /> Approved service only.branch circuits to be done at a later date. <br /> 6/20/2025 6/20/2025 ELEC 10-FINAL** MICHAEL APPRVD-PERMIT eTRAKiT Inspection Request <br /> WICKLANDER FINAL <br /> Notes: <br /> 6/17/2025 2:09 PM CM AIR PROS LLC(ELEC) <br /> CUSTOMER IS CONTACT. <br /> Contact Name:KEITH BLACK <br /> Site Address:4910 W VIEW DR <br /> Phone:4252445327 <br /> e-Mail:PERMITS@CMHEATING.COM <br /> Approve permit final for panel swap and new AFCI protected lighting circuit.Panel schedule is neat and complete. <br /> I <br /> Printed:Saturday, 16 August, 2025 1 of 1 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.