Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2504-199 Description: Boiler&circulation pump swap <br /> Applied:4/28/2025 Approved:4/28/2025 Site Address:4230 COLBY AVE <br /> Issued:4/28/2025 Finaled: 5/6/2025 City,State Zip Code: EVERETT,WA 98203-2312 <br /> Status: FINALED Applicant: PRECISION ELECTRIC GROUP INC <br /> Parent Permit: Owner:GREENLAKE EVERETT LLC <br /> Parent Project: Contractor: PRECISION ELECTRIC GROUP INC <br /> Details: <br /> Boiler&circulation pump swap-like for like;disconnect old boiler&circulation pump,connect new boiler&circulation pump <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 5/2/2025 5/2/2025 ELEC 10-FINAL** MICHAEL PARTIAL eTRAKiT Inspection Request <br /> WICKLANDER APPROVAL <br /> Notes: <br /> 4/29/2025 7:30 AM PRECISION ELECTRIC GROUP INC <br /> Aaron Digre will be your POC <br /> Contact Name:PRECISION ELECTRIC GROUP INC <br /> Site Address:4230 COLBY AVE <br /> Phone:2069482627 <br /> e-Mail:aarond@precisionelectricgroup.com <br /> Approve partial final for circulation pump replacement.thermostat to be replaced next week once those are installed,we can final. <br /> 5/6/2025 5/6/2025 T LEC 10-FINAL** I MICHAEL JAPPRVD-PERMIT eTRAKiT Inspection Request <br /> WICKLANDER FINAL <br /> Notes: <br /> 5/2/2025 12:37 PM PRECISION ELECTRIC GROUP INC <br /> AM inspection if possible-Christopher Throop(number above)will be the POC <br /> Contact Name:PRECISION ELECTRIC GROUP INC <br /> Site Address:4230 COLBY AVE <br /> Phone:2063006909 <br /> e-Mail:rondar@precisionelectricgroup.com <br /> Approve final for Circ pump controllers. <br /> I <br /> Printed:Saturday, 16 August, 2025 1 of 1 rk <br /> SUPERION <br />