My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
916 PACIFIC AVE BASE FILE 2025-09-29
>
Address Records
>
PACIFIC AVE
>
916
>
BASE FILE
>
916 PACIFIC AVE BASE FILE 2025-09-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 1:42:29 PM
Creation date
8/18/2025 9:28:15 AM
Metadata
Fields
Template:
Address Document
Street Name
PACIFIC AVE
Street Number
916
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bronson Pearson <br /> From: Jason Schoenwald <jschoenwald@veca.com> <br /> Sent: Thursday, May 22, 2025 9:32 AM <br /> To: Kevin Frey; Nancy Dumont <br /> Cc: Kurtis Brown; Bronson Pearson <br /> Subject: RE: [EXTERNAL] Providence Pacific Elevator Modernization <br /> Attachments: J00150928 Providence Everett DWG 01-31-2024.pdf, Inspection Detail Report Car 1.pdf, <br /> InspectionDetailReport Car 2.pdf; Inspection Detail Report Car 3.pdf, <br /> InspectionDetailReport Car 4.pdf, eTRAKiT Inspection Report.pdf <br /> Category 2:Sensitive information <br /> Bronson, <br /> Thanks for taking my cal[.As explained,we are 100%complete with the electrical and fire alarm for this project. I <br /> have electrical final on all 5 cars and L&I signed off on fire alarm for cars 1-4.When TKE went to final car 5 with <br /> L&I, during the weight test the car shifted against the rail because a weld broke on the cab floor,this shut the final <br /> down, and the car was red tagged. Providence does not know when they will have the funds to make the repairs, so <br /> we are trying to just final the permit for cars 1-4 and then just pull an inspection permit at a later date for car 5.The <br /> system has been 100% pre-tested by Convergint and is functioning. <br /> I have attached the fire alarm drawings for the project, L& I inspection reports for cars 1-4 and COE inspection <br /> report. <br /> Let us know if you need anything else. <br /> Thanks <br /> `PgtISHg�,9 Jason Schoenwald <br /> General Foreman PRMCE <br /> VECA [C]206-850-7938 <br /> „W Jason.Schoenwald@veca.com <br /> www.veca.com <br /> Category 2:For official use only/disclosure permissible bylaw. <br /> From: Kevin Frey<kevin.frey@convergint.com> <br /> Sent:Thursday, May 22, 2025 9:09 AM <br /> To:Jason Schoenwald <jschoenwald@veca.com>; Nancy Dumont<NDumont@veca.com> <br /> Subject: FW: [EXTERNAL] Providence Pacific Elevator Modernization <br /> In response to my phone call this morning below is what Bronson wants me to do. I'll do what I can but our <br /> engineering que is running 2 weeks before they look at requests. <br /> Kevin Frey I Project Manager I Convergint Technologies <br /> 0: 425-272-2250 M: 425-591-5815 E: kevin.frey@convergint.com <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.