Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2309-029 Description: MODERNIZE OFC,NEW WALL,TOILETS,INTERIOR& <br /> EXTERIOR STAIRS <br /> Applied:9/9/2023 Approved: 1/31/2024 Site Address: 5131 COLBY AVE <br /> Issued:2/6/2024 Finaled: City,State Zip Code: EVERETT,WA 98203 <br /> Status: PERMIT ISSUED-PAPER Applicant: PAUL DOUGLAS <br /> Parent Permit: Owner: RIDDLE DARREN AND HEIDI <br /> Parent Project: Contractor: BUILDERS IMPROVEMENT GROUP LLC <br /> Details: <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 4/19/2024 4/19/2024 BLDG 02- Matt Schreifels PARTIAL see notes <br /> FOOTING/SETBACK APPROVAL <br /> Notes: <br /> HANNA <br /> 253-254-8730 <br /> HANNAHBIG-WA.COM <br /> Inspected the interior footing pier pads only.Ok to place concrete.Schedule for footing/Setback inspection for exterior footing when ready. <br /> 5/17/2024 5/17/2024 BLDG 02- Matt Schreifels APPROVAL eTRAKiT Inspection Request <br /> FOOTING/SETBACK <br /> Notes: <br /> 5/15/2024 12:42 PM BUILDERS IMPROVEMENT GROUP LLC <br /> inspection for exterior footing <br /> Contact Name:BUILDERS IMPROVEMENT GROUP LLC <br /> Site Address:5131 COLBY AVE <br /> Phone:4258707210 <br /> e-Mail:Hannah@big-wa.com <br /> 6/3/2024 6/3/2024 BLDG 08-FRAMING Matt Schreifels NO ACCESS See notes <br /> Notes: <br /> Contact Name:BUILDERS IMPROVEMENT GROUP LLC <br /> Site Address:5131 COLBY AVE <br /> Phone:4258707210 <br /> e-Mail:Hannah@big-wa.com <br /> No Access. Please reschedule online when access is available.To speak with an Inspector to get an ETA or to provide access instructions please call 425- <br /> 257-8810 option 4 between 730a.m.and 830a.m.the morning of your scheduled inspection.Knocked at front upper and at lower doors with no <br /> response.Appears someone might be on site,but was unable to contact them to get access. <br /> 6/5/2024 6/5/2024 BLDG 08-FRAMING Matt Schreifels NOT READY see notes <br /> Notes: <br /> Dan Wagner206-914-2548 <br /> Must receive Ruffin approval for plumbing and mechanical prior to building inspection for framing.Will reinspect at next inspection for framing,fire, <br /> stop and insulation. <br /> I <br /> Printed:Thursday, 11 July, 2024 1 of 3 rk <br /> SUPERION <br />