Laserfiche WebLink
PAUL DOUGLAS <br /> 5131 COLBY AVE <br /> B2309-029 <br /> In order for the processing of your application to continue, the following documentation, hardcopy <br /> only, shall be submitted to Permit Services for review: <br /> a. Itemized letter addressing the comments provided below. <br /> b. Two complete sets of revised construction drawings, cloud all updated parts. <br /> c. Two copies of supplemental structural calculations (only if required by reviewer). <br /> Submittal documents should contain sufficient information and detail to review the proposed project <br /> for compliance with the adopted building codes. Upon submittal of the revised documents, your <br /> application will be given priority and the review will recommence. <br /> Architectural (Comments provided by Yin Lu) <br /> 1. Reception area and Break room shall be assembly space. Per IBC 303.1.2, a room or space <br /> used for assembly purposes that is less than 750 square feet in area and accessory to <br /> another occupancy shall be classified as a Group B occupancy or as part of that occupancy. <br /> However, when calculate occupant load for egress purpose, those assembly spaces will be <br /> counted as assembly space. Please update occupant load calculation. <br /> 2. Based on comment #1, Break room will be assembly space, sliding door won't work per IBC <br /> 1010.1.2. Please update accordingly. <br /> 3. The doors providing egress should have panic hardware even though existing doors. IBC <br /> Section 1010.1.10. <br /> 4. The break room should be provided with maximum occupant load signs per IBC Section <br /> 1004.9. The locations of the signs should be specified in the floor plans. <br /> Structural (Comments provided by Cal Bearman) <br /> 5. The project appears to involve structural modifications. Where a structural design is <br /> performed, structural drawings and calculations should be prepared by a professional <br /> engineer licensed in the state of Washington; the drawings and calculations should bear the <br /> seal and signature of the engineer. See RCW Sections 18.43.010, 18.43.020, and 18.43.070. <br /> This review has been performed for general compliance with the building codes as adopted and <br /> amended by the state of Washington and the city of Everett. Corrections and comments made <br /> during the review process do not relieve the project from compliance with code and permit <br /> requirements. The designers-of-record are responsible for a complete design in accordance with the <br /> laws of the state of Washington. <br /> If you have any questions or require additional clarification, please contact us. <br /> Sincerely, <br /> S <br /> 3200 Cedar Street © 425.257.8810 r6(� permitservices@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax everettwa.gov/permits <br /> Page 2 of 3 <br />