My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2313 COLUMBIA AVE B 2025-09-10
>
Address Records
>
COLUMBIA AVE
>
2313
>
2313 COLUMBIA AVE B 2025-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 10:20:04 AM
Creation date
8/18/2025 2:21:14 PM
Metadata
Fields
Template:
Address Document
Street Name
COLUMBIA AVE
Street Number
2313
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drew Martin <br /> From: Drew Martin <br /> Sent: Tuesday,June 20, 2023 12:11 PM <br /> To: jeffropk@yahoo.com <br /> Subject: City of Everett Permit Services: 2313 Columbia Avenue (B2209-004) - Third Building <br /> Review <br /> Attachments: B2209-004_R2.docx; B2209-004_R2.pdf <br /> Hello,Jeffrey. <br /> This email follows our telephone discussion regarding this project. As we discussed,the changes to the drawings do not <br /> sufficiently address the comments provided in the last review letter(attached again for your convenience). I am <br /> attaching this letter and providing supplemental commentary for the designer. The drawings need to be revised to <br /> completely address all comments. <br /> Per our discussion, I should be available on June 30 @ 8-9am for a coordinated call with you and your designer. Please <br /> respond with an email confirming this date and time, and I will send out a virtual meeting appointment. <br /> The comments in the previous review letter dated March 15, 2023, with the supplemental commentary below, should <br /> be addressed. The supplemental commentary has been coordinated with the review comments from the previous <br /> letter. An itemized response letter that clearly addressed each comment should be provided; note that the previous <br /> submittal did not include an adequate response letter(please inquire further if additional clarification this requirement <br /> is needed). <br /> Supplemental Commentary <br /> General: <br /> 1. No additional action required. <br /> Architectural: <br /> 1. The drawings are required to include a schedule and performance requirements for the selected credits. Note <br /> that the submitted form does not select a normalization credit; based on the understood intention to install a <br /> heat pump,this will benefit the owner with a 0.5 credits (i.e., a reduction on the overall credits required). It is <br /> noted that more credits are selected than required; only 3.0 credits are required for buildings not exceeding <br /> 1,500 SF. Lastly, one of the credits requires increased performance of the components of the exterior envelop, <br /> specifically the fenestrations and under-slab insulation. These have not been updated. The slab insulation also <br /> does not comply with WSEC Section R402.2.9. <br /> 2. The selected system needs additional information, including but not limited to the sound rating,ventilation rate, <br /> and whether the fan will run continuously or intermittently. It appears that the proposed system consists only <br /> of an exhaust fan that will draw air from the upper level;this should be clarified. It is noted that the selected fan <br /> appears to have a 3,000 CFM continuous exhaust rate,which is excessive and not recommended. <br /> 3. No additional action required. <br /> 4. First Floor Plan 1/A101 should specify the minimum clearance. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.