My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3618 SHORE AVE 2025-08-18
>
Address Records
>
SHORE AVE
>
3618
>
3618 SHORE AVE 2025-08-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2025 3:53:53 PM
Creation date
8/18/2025 2:54:45 PM
Metadata
Fields
Template:
Address Document
Street Name
SHORE AVE
Street Number
3618
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'versions can cause greater impacts than would otherwise occur by discharging runoff at the nat- <br /> ure .cation. <br /> Where • conveyance system exists at the adjacent downgradient property line and the discharge <br /> was previo► ly unconcentrated flow or significantly lower concentrated flow,then measures must be <br /> taken to prey-•t downgradient impacts. Drainage easements from downstream property owners <br /> may be needed .•d should be obtained prior to approval of engineering plans. <br /> The following dischar.- requirement is recommended: <br /> Where no conveyance sy -m exists at the abutting downstream property line and the natural(exist- <br /> ing)discharge is unconcentr. ed, any runoff concentrated by the proposed project must be dis- <br /> charged as follows: <br /> a. If the 100-year peak discharg- as estimated using an approved continuous runoff model <br /> using 15-minute time steps, is le than or equal to 0.3 cfs under existing conditions and will <br /> remain less than or equal to 0.3 cfs ► der developed conditions,then the concentrated runoff <br /> may be discharged onto outlet protects. with riprap, such as those described in V-1.4.3 Out- <br /> fall Systems, or to any other system that rves to disperse flows. <br /> b. If the 100-year peak discharge, as estimated .ing an approved continuous runoff model <br /> using 15-minute time steps, is less than or equal • 0.75 cfs under existing conditions and will <br /> remain less than or equal to 0.75 cfs under develop.. conditions,then the concentrated runoff <br /> may be discharged through a dispersal trench, such a hose described in V-1.4.3 Outfall Sys- <br /> tems, or other dispersal system, provided the applicant c.• demonstrate that there will be no <br /> significant adverse impact to downhill properties or drainage ystems. <br /> c. If the 100-year peak discharge, as estimated using an approved ..ntinuous runoff model <br /> using 15-minute time steps, is greater than 0.75 cfs for either existino or developed conditions, <br /> or if a significant adverse impact to downgradient properties or draina•- systems is likely,then <br /> a conveyance system must be provided to convey the concentrated runo .cross the down- <br /> stream properties to an acceptable discharge point(i.e., an enclosed draina•- system or open <br /> drainage feature where concentrated runoff can be discharged without signific. t adverse <br /> impact). <br /> Stormwater control or treatment structures should not be located within the expected 25-yea ater <br /> level elevations for salmonid-bearing waters. Such areas may provide off-channel habitat forju -n- <br /> ile salmonids and salmonid fry. Designs for outfall systems to protect against adverse impacts from <br /> concentrated runoff are included in V-1.4.3 Outfall Systems. <br /> 1-3.4.5 MR5: On-Site Stormwater Management <br /> • <br /> Projects shall employ Stormwater Management BMPs in accordance with the following <br /> thresholds,standards, and lists to infiltrate, disperse, and retain stormwater runoff on site to the <br /> extent feasible without causing flooding or erosion impacts. <br /> 2019 Stormwater Management Manual for Western Washington <br /> Volume I-Chapter 3-Page 115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.