My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
710 N BROADWAY 2024 GREENSHIELDS INDUSTRIAL SUPPLY Plans 2025-08-19
>
Address Records
>
N BROADWAY
>
710
>
GREENSHIELDS INDUSTRIAL SUPPLY
>
Plans
>
710 N BROADWAY 2024 GREENSHIELDS INDUSTRIAL SUPPLY Plans 2025-08-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2025 10:35:39 AM
Creation date
8/19/2025 10:35:14 AM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
710
Tenant Name
GREENSHIELDS INDUSTRIAL SUPPLY
Permit
B2402-040
Year
2024
Notes
CREATE DOORWAYS IN CINDERBLOCKS & INSTALL NEW DOORS
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Legion Dr <br /> 84'-0" <br /> i , Three new opening will be saw cut into <br /> Gara e lm existing 8" CMU walls and headers <br /> Hose X i GaragDoor installed. The CMU block joints do not <br /> Room i Area i appear in the proper position in the <br /> ---------- drawings. The door opening align with the <br /> 1 <br /> 2 block seams. <br /> The two walls in the garage door area <br /> 1 I , are carrying just the roof load bearing <br /> } } 1 and will have 2x8 #2 DF headers The <br /> 1 1 I rafters run East-West sandwiching the <br /> Par CMU block with J" bolts, nuts and <br /> I 1 <br /> ts <br /> -----------J enlarged washers each side of the block. <br /> >. 4x12 Floor Beams Room The rafter orientation is East-West. <br /> O I >•�_ _ _ _ I The single opening by the bathroom will <br /> CD 1 00 - -� o have an J" thick metal shoe installed. The <br /> shoe will require field fitting. Three of the 3 <br /> LO <br /> o o I I = _ L original bolt holes and a notch for a <br /> a' o 0 4x12 beam at least <br /> 1 <br /> J Show I I I � During header 3 installation temporary € <br /> Room - - + - - I bracing needs to be installed to support <br /> r— 1 0 each side of the existing wall. <br /> h ro <br /> See details for each type. <br /> W <br /> Z m After installation of the header the cut <br /> edges of the CMU will be finished with a <br /> 5 N Portland cement skim coat. <br /> 024 8 16 <br /> fJ,,V Cut three new openings through CMU block existing <br /> ,. walls. <br /> 100'-0" <br /> N Broadway Ave 710 N Broadway New Door Openings <br /> Trevor Murphy <br /> � 7Z� 710 North Broodwat <br /> Everett, WA 98201 <br /> NOTE Fulgham Engineering LLC <br /> Customer is responsible for general artmrgement, Graham,WA 98338 <br /> location and clearoncs in relationship to building <br /> and other customer equipment orce Number <br /> 4 00td 2 -01-17 49710005 900 <br /> This drawing including the design and principles aur.;rWER Citrium Pick Rowe Engineers <br /> of construction die a re <br /> closed the property of g <br /> Fulgham Engineering,LLC and is submitted on Bothell, WA <br /> the understanding that it is not to be reprad <br /> nor copied in whale or in part nor boned or ME <br /> athenise commun'aated to arty third party party Plan View <br /> nor used in any manner detrimental to the S¢E DRAWING NAME <br /> irderesb of Fulgham Engineering,LLC without its Greenfield Rev 3 Page 2 of 52 <br /> express consent Acceptance of the drawing will <br /> B Architectural 9 <br /> be construed as an agree ve.agreement to the abo <br />
The URL can be used to link to this page
Your browser does not support the video tag.